Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 7 pages
Exam (elaborations)

Study Guide for Tower Crace Questions and answers graded A+ 2025/2026

Document preview thumbnail
Preview 2 out of 7 pages

Study Guide for Tower Crace Questions and answers graded A+ 2025/2026

Content preview

Study Guide for Tower Crace

Before crane erection can begin what must be available? - ANS-Surface that is firm, drained
and graded

OSHA 29 CFR 1926.1407 Power Line Safety, Option 1 Requires what? - ANS-Power Lines are
de-energized and grouded

OSHA 29 CFR 1926.1407 Power Line Safety, Option 2 Requires what? - ANS-20 Foot
Clearance

OSHA 29 CFR 1926.1407 Power Line Safety, Option 3 Requires what? - ANS-Table Clearance

Before work can began for a new erected tower carne what must be done before crane can
begin working? - ANS-Set load motion limits and safety devices

What type of attachment system is used to hold a personnel platform to the crane hook -
ANS-Master link attachment or safety type shackle

When should a personnel platform be used - ANS-there is no other safe way to perform the task

OSHA, Cranes and Derricks working in Construction is under what regulation - ANS-29 CFR
1926

What is the safety Factor of suspended platform and shackles - ANS-10 to 1

What ASME Standard applies to personnel platforms - ANS-B 30.23

Annual inspection records must be kept for how long - ANS-12 months

What ASME Standard applies to Tower Cranes - ANS-B 30.3

Expendable tower base, the tolerance for "plumb" is? - ANS-1/4 - 10ft

Free standing Hammerhead tower crane mast will be "plumbed" to a tolerance of; - ANS-1 inch
= 40ft

Before crane components are erected they shall be - ANS-Visually inspected for damage from
shipping and handling

Where would the insulating link device be attached - ANS-Attached or installed at the end of
load line and the load

, annual/comprehensive inspection must include the qualified person to perform - ANS-functional
motion testing of the equipment

rail buffers or rail stops must be placed how far from the end of the travel tracks - ANS-3 ft

Internal climbing crane must be plumbed by using what to hold the crane in position -
ANS-Wedges

What is the maximum rate of wind speed allowed to climb a tower crane - ANS-20 mph

During erection or dismantling operations, who must always be present - ANS-AD director

How many wraps shall remain on the hoist drum according to the Tower Crane Reference
Manual - ANS-3

Personnel Platform must be Proof Tested each day before use, how much weight is sued and
how long must the test last for - ANS-125% and hold for 5 minutes

OSHA 1926. 1407 power requirements for 1000kv are - ANS-Remain 20' or more from lines

Standing rope or pendant lines must have the following minimum design factor of - ANS-3:1

OSHA 1926. 1412 inspections requirements are - ANS-Monthly and annually inspection

Hydraulic cylinders must have what safety device to prevent accidental retracting - ANS-check
valves

Foundations and structural supports must be designed by - ANS-Registered professional
engineer

Who must provide erecting procedures to ensure the crane manufactures instructions are
followed - ANS-A/D Director

Before each crane component is erected who must perform the Pre-erection inspection -
ANS-Qualified person

ASME B30.0, equipment not in regular use and idle for more than 3 months require -
ANS-frequent and periodic

During load testing operations what is the maximum load capacity? - ANS-110%

How many broken wires are allowable at the end of standing rope - ANS-1

Document information

Uploaded on
March 29, 2025
Number of pages
7
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$12.59

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
1
Followers
0
Items
638
Last sold
1 year ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions