DVP SWPPP Exam Graded A+ -Solved
A sediment trap is designed to - ANSWER-Capture and retain sediment from a portion
of the site
A SWPPP site map will show all of the following except - ANSWER-Notices of violation
A well designed SWPPP should be - ANSWER-Site-specific
Accelerated erosion is erosion that is most often influenced by - ANSWER-Human
actions
BMP's identified by the SWPPP inspector as needing repairs must be corrected and
documented as such - ANSWER-In a timely manner and in compliance with the
SWPPP
Common types of erosion include all of the following except - ANSWER-Sedimentation
Concrete washout water has a high - ANSWER-PH
Contractor shall at all time keep just in true books, records, and accounts at its facility
showing the actual costs and expense that the contractor included authorized
representative shall have the right, during the term of this contract and for two years
after the earlier of the completion of the work of the terminated contract examined and
audit the box, records, and accounts that pertain to this contract - ANSWER-True
Erosion and sediment control principles do NOT include which of the following -
ANSWER-Leave unprotected openings for stormwater and sediment to leave the site
Hiring workers who are not work authorized or not executing WV program can result in
what - ANSWER-1. Construction site closure
2. Situational audit
3. Additional training
4. ALL OF THE ABOVE
How is site access monitored - ANSWER-1. Badges
2. Access point check-in/check-out
3. Daily site walks
4. ALL OF THE ABOVE
If a direct Walmart contractor comes on site, do they need to produce a WV Form for
their workers - ANSWER-No
, If a worker is removed during an audit, are they allowed back on site? - ANSWER-
Workers removed during an audit are not allowed back, or onto another site unless the
auditor verifies the worker is work authorized
If you believe stormwater BMP modifications are necessary, you must - ANSWER-
Secret and approval from the project SWPPP designer and, if required, the project
owner
If your site is inspected by US EPA, or another regulatory agency, you should: -
ANSWER-1. Be courteous
2. Attend their inspection
3. Allow access to sight and documentation
4. ALL OF THE ABOVE
In addition to work or verification and badging, what other employment incidents and/or
regulatory contacts may happen? - ANSWER-Immigration, E verify wages, harassment,
discrimination end, joint employment - Be aware of not only federal laws but also the
state and local municipalities you work in
In what circumstances must your company run newly hired employees through E-
Verify? - ANSWER-When the new hire employee will provide services to Walmart in a
mandatory E-Verify state: AL, AZ, GA, LA, MS, NC, SC, TN, or UT
Of the following factors that influence erosion rates, the one a contractor has the most
control over (only select one) is - ANSWER-Groundcover
Of the following, which is a primary erosion control objective? - ANSWER-Minimize the
extent and duration of soil exposure - stabilized disturbed areas quickly
Potential pollutant sources stored on a construction site may include - ANSWER-1.
Petroleum storage tanks
2. Soil sediments
3. Masonary material
4. ALL OF THE ABOVE
Proper spill management should include all of the following EXCEPT - ANSWER-
Installation of a spill pit on your construction site
Relative to stormwater permitting all of the following must occur before construction
starts except - ANSWER-Submit the notice of termination (NOT)
Requirements for managing stormwater activity on a construction site are outlined in the
following regulation - ANSWER-NPDES
Runoff controls include all but which of the following - ANSWER-Rolled erosion control
products
A sediment trap is designed to - ANSWER-Capture and retain sediment from a portion
of the site
A SWPPP site map will show all of the following except - ANSWER-Notices of violation
A well designed SWPPP should be - ANSWER-Site-specific
Accelerated erosion is erosion that is most often influenced by - ANSWER-Human
actions
BMP's identified by the SWPPP inspector as needing repairs must be corrected and
documented as such - ANSWER-In a timely manner and in compliance with the
SWPPP
Common types of erosion include all of the following except - ANSWER-Sedimentation
Concrete washout water has a high - ANSWER-PH
Contractor shall at all time keep just in true books, records, and accounts at its facility
showing the actual costs and expense that the contractor included authorized
representative shall have the right, during the term of this contract and for two years
after the earlier of the completion of the work of the terminated contract examined and
audit the box, records, and accounts that pertain to this contract - ANSWER-True
Erosion and sediment control principles do NOT include which of the following -
ANSWER-Leave unprotected openings for stormwater and sediment to leave the site
Hiring workers who are not work authorized or not executing WV program can result in
what - ANSWER-1. Construction site closure
2. Situational audit
3. Additional training
4. ALL OF THE ABOVE
How is site access monitored - ANSWER-1. Badges
2. Access point check-in/check-out
3. Daily site walks
4. ALL OF THE ABOVE
If a direct Walmart contractor comes on site, do they need to produce a WV Form for
their workers - ANSWER-No
, If a worker is removed during an audit, are they allowed back on site? - ANSWER-
Workers removed during an audit are not allowed back, or onto another site unless the
auditor verifies the worker is work authorized
If you believe stormwater BMP modifications are necessary, you must - ANSWER-
Secret and approval from the project SWPPP designer and, if required, the project
owner
If your site is inspected by US EPA, or another regulatory agency, you should: -
ANSWER-1. Be courteous
2. Attend their inspection
3. Allow access to sight and documentation
4. ALL OF THE ABOVE
In addition to work or verification and badging, what other employment incidents and/or
regulatory contacts may happen? - ANSWER-Immigration, E verify wages, harassment,
discrimination end, joint employment - Be aware of not only federal laws but also the
state and local municipalities you work in
In what circumstances must your company run newly hired employees through E-
Verify? - ANSWER-When the new hire employee will provide services to Walmart in a
mandatory E-Verify state: AL, AZ, GA, LA, MS, NC, SC, TN, or UT
Of the following factors that influence erosion rates, the one a contractor has the most
control over (only select one) is - ANSWER-Groundcover
Of the following, which is a primary erosion control objective? - ANSWER-Minimize the
extent and duration of soil exposure - stabilized disturbed areas quickly
Potential pollutant sources stored on a construction site may include - ANSWER-1.
Petroleum storage tanks
2. Soil sediments
3. Masonary material
4. ALL OF THE ABOVE
Proper spill management should include all of the following EXCEPT - ANSWER-
Installation of a spill pit on your construction site
Relative to stormwater permitting all of the following must occur before construction
starts except - ANSWER-Submit the notice of termination (NOT)
Requirements for managing stormwater activity on a construction site are outlined in the
following regulation - ANSWER-NPDES
Runoff controls include all but which of the following - ANSWER-Rolled erosion control
products