Temporary stabilization - 🧠ANSWER ✔✔stone or plastic as a BMP to
reduce erosion by stabilizing areas that will lay bare for an extended
amount of time. EX. stockpiles, dikes, dams
5 types of plans - 🧠ANSWER ✔✔1. SWPPP
2. erosion and sed. plan (ESCP)
3. drainage plan/grading plan
4. spill prevention control and countermeasure plan (SPCC)
5. MS4 stormwater management plan/program (SWMP)
SWPPP - 🧠ANSWER ✔✔-required by NPDES for industrial, multi sector,
and construction general permits
-addresses operations that come in contact with stormwater and specific
BMPs for reduction or elimination of discharges
-site specific
COPYRIGHT©JOSHCLAY 2025/2026. YEAR PUBLISHED 2025. COMPANY REGISTRATION NUMBER: 619652435. TERMS OF USE. PRIVACY 1
STATEMENT. ALL RIGHTS RESERVED
, -identifies features, site activities and pollutants of concern
Erosion & sediment control plan (ESCP) - 🧠ANSWER ✔✔-a component of
a construction permit
-can sometimes be a part of an industrial permit (ex mining)
-shows all required E&S controls; including design, placement, and details
Drainage/ grading plans - 🧠ANSWER ✔✔-a component of the swppp
-is used for inspection of MS4 stormwater systems
- sometimes combined with ESCP
Spill Prevention Control and Countermeasures Plan - 🧠ANSWER ✔✔-part
of construction permit OR
-part of industrial multi sector permit
-may be included in MS4 permits (housekeeping)
-details all spill prevention measures on site
-details spill clean up
-details training requirements of staff
-details good housekeeping BMPs
COPYRIGHT©JOSHCLAY 2025/2026. YEAR PUBLISHED 2025. COMPANY REGISTRATION NUMBER: 619652435. TERMS OF USE. PRIVACY 2
STATEMENT. ALL RIGHTS RESERVED
Detailed Answers | Get it 100% Correct
Answers
Temporary stabilization - 🧠ANSWER ✔✔stone or plastic as a BMP to
reduce erosion by stabilizing areas that will lay bare for an extended
amount of time. EX. stockpiles, dikes, dams
5 types of plans - 🧠ANSWER ✔✔1. SWPPP
2. erosion and sed. plan (ESCP)
3. drainage plan/grading plan
4. spill prevention control and countermeasure plan (SPCC)
5. MS4 stormwater management plan/program (SWMP)
SWPPP - 🧠ANSWER ✔✔-required by NPDES for industrial, multi sector,
and construction general permits
-addresses operations that come in contact with stormwater and specific
BMPs for reduction or elimination of discharges
-site specific
COPYRIGHT©JOSHCLAY 2025/2026. YEAR PUBLISHED 2025. COMPANY REGISTRATION NUMBER: 619652435. TERMS OF USE. PRIVACY 1
STATEMENT. ALL RIGHTS RESERVED
, -identifies features, site activities and pollutants of concern
Erosion & sediment control plan (ESCP) - 🧠ANSWER ✔✔-a component of
a construction permit
-can sometimes be a part of an industrial permit (ex mining)
-shows all required E&S controls; including design, placement, and details
Drainage/ grading plans - 🧠ANSWER ✔✔-a component of the swppp
-is used for inspection of MS4 stormwater systems
- sometimes combined with ESCP
Spill Prevention Control and Countermeasures Plan - 🧠ANSWER ✔✔-part
of construction permit OR
-part of industrial multi sector permit
-may be included in MS4 permits (housekeeping)
-details all spill prevention measures on site
-details spill clean up
-details training requirements of staff
-details good housekeeping BMPs