FDOT BATCH PLANT OPERATOR'S QUIZ
WITH ANSWERS
ABSOLUTE VOLUME OF A MATERIAL IS: - correct answers -VOLUME OF A
MATERIAL IN A VOIDLESS STATE
THE THREE METHODS WHICH MAY BE USED TO DETERMINE FREE MOISTURE
ARE: - correct answers -COOKOUT, TOWEL DRY, AND PROBE
PLANT PERSONNEL MUST INSPECT MIXER TRUCKS FOR WHAT 5 ITEMS? -
correct answers -COUNTER, WATER, RATING PLATE, DRUM, AND BLADES
THE SIX TYPES OF CEMENT ALLOWED IN FDOT CONCRETE MIXES ARE? -
correct answers -1, 2, 3, 1-P, 1-S, 1-P(MS)
WHEN 2 PORTLAND CEMENTS ARE GROUND DIFFERENTLY, ONE FINER THAN
THE OTHER, THE FINER ONE WILL: - correct answers -GENERATE MORE HEAT,
SET MORE QUICKLY, AND GIVE GENERALLY HIGHER EARLY STRENGTH.
WITH ANSWERS
ABSOLUTE VOLUME OF A MATERIAL IS: - correct answers -VOLUME OF A
MATERIAL IN A VOIDLESS STATE
THE THREE METHODS WHICH MAY BE USED TO DETERMINE FREE MOISTURE
ARE: - correct answers -COOKOUT, TOWEL DRY, AND PROBE
PLANT PERSONNEL MUST INSPECT MIXER TRUCKS FOR WHAT 5 ITEMS? -
correct answers -COUNTER, WATER, RATING PLATE, DRUM, AND BLADES
THE SIX TYPES OF CEMENT ALLOWED IN FDOT CONCRETE MIXES ARE? -
correct answers -1, 2, 3, 1-P, 1-S, 1-P(MS)
WHEN 2 PORTLAND CEMENTS ARE GROUND DIFFERENTLY, ONE FINER THAN
THE OTHER, THE FINER ONE WILL: - correct answers -GENERATE MORE HEAT,
SET MORE QUICKLY, AND GIVE GENERALLY HIGHER EARLY STRENGTH.