FDOT BATCH PLANT OPERATOR'S QUESTIONS
WITH CORRECT ANSWERS 2025
AbsoluteEvolumeEofEaEmaterialEis:E-EcorrectEanswerE-volumeEofEaEmaterialEinEaEvoidlessEstate
TheEthreeEmethodsEwhichEmayEbeEusedEtoEdetermineEfreeEmoistureEare:E-EcorrectEanswerE-
cookout,EtowelEdry,EandEprobe
PlantEpersonnelEmustEinspectEmixerEtrucksEforEwhatE5Eitems?E-EcorrectEanswerE-
counter,Ewater,EratingEplate,Edrum,EandEblades
TheEsixEtypesEofEcementEallowedEinEfdotEconcreteEmixesEare?E-EcorrectEanswerE-1,E2,E3,E1-p,E1-s,E1-
p(ms)
WhenE2EportlandEcementsEareEgroundEdifferently,EoneEfinerEthanEtheEother,EtheEfinerEoneEwill:E-
EcorrectEanswerE-generateEmoreEheat,EsetEmoreEquickly,EandEgiveEgenerallyEhigherEearlyEstrength.
AbsorbedEmoistureEofEaggregatesEisEdefinedEas:E-EcorrectEanswerE-
theEmoistureEwithinEtheEaggregateEthatEdoesEnotEcontributeEtoEtheEload
AElowerEwater-cementEratioEwillEeffectEconcreteEby:E-EcorrectEanswerE-
beingEmoreEdurableEwithEgreaterEstrength
AnEaggregateEthatEisEsaturated,EsurfaceEdryE(ssd)Eis:E-EcorrectEanswerE-
inEtheEproperEconditionEforEfdotEconcreteEandEfullyEabsorbedEcondition
HotEweatherEconcrete'sEmaximumEtemperatureEis:E-EcorrectEanswerE-100EdegreesEf
ConcreteEqualityEcontrolErecordsEareErequiredEtoEbe:E-EcorrectEanswerE-
atEeachEcertifiedEdotEplantEandEmaintainedEforE3Eyears
WITH CORRECT ANSWERS 2025
AbsoluteEvolumeEofEaEmaterialEis:E-EcorrectEanswerE-volumeEofEaEmaterialEinEaEvoidlessEstate
TheEthreeEmethodsEwhichEmayEbeEusedEtoEdetermineEfreeEmoistureEare:E-EcorrectEanswerE-
cookout,EtowelEdry,EandEprobe
PlantEpersonnelEmustEinspectEmixerEtrucksEforEwhatE5Eitems?E-EcorrectEanswerE-
counter,Ewater,EratingEplate,Edrum,EandEblades
TheEsixEtypesEofEcementEallowedEinEfdotEconcreteEmixesEare?E-EcorrectEanswerE-1,E2,E3,E1-p,E1-s,E1-
p(ms)
WhenE2EportlandEcementsEareEgroundEdifferently,EoneEfinerEthanEtheEother,EtheEfinerEoneEwill:E-
EcorrectEanswerE-generateEmoreEheat,EsetEmoreEquickly,EandEgiveEgenerallyEhigherEearlyEstrength.
AbsorbedEmoistureEofEaggregatesEisEdefinedEas:E-EcorrectEanswerE-
theEmoistureEwithinEtheEaggregateEthatEdoesEnotEcontributeEtoEtheEload
AElowerEwater-cementEratioEwillEeffectEconcreteEby:E-EcorrectEanswerE-
beingEmoreEdurableEwithEgreaterEstrength
AnEaggregateEthatEisEsaturated,EsurfaceEdryE(ssd)Eis:E-EcorrectEanswerE-
inEtheEproperEconditionEforEfdotEconcreteEandEfullyEabsorbedEcondition
HotEweatherEconcrete'sEmaximumEtemperatureEis:E-EcorrectEanswerE-100EdegreesEf
ConcreteEqualityEcontrolErecordsEareErequiredEtoEbe:E-EcorrectEanswerE-
atEeachEcertifiedEdotEplantEandEmaintainedEforE3Eyears