Gcss Army Equipment Records Parts
Specialist (Practical Exercise) Questions
And Answers With Verified Solutions
100% Correct Rated A+
GCSS-Army Maintenance & Logistics Study Guide
Equipment Dispatch & Work Orders
1. What action cannot be performed before a Dispatch (D1) notification is saved
and a notification number is generated?
✔ The Equipment Dispatch (5987) form cannot be printed
2. What operational status symbol indicates that equipment is non-mission capable
due to a maintenance requirement?
✔ (Red Flag) NMC Maintenance
3. In a forwarded work order, which work center updates the work order status to
"R" (awaiting pickup)?
✔ The supporting work center
4. Which two fields are updated to indicate that forwarded equipment has been
picked up?
✔ The operational system condition and main work center
5. What button is clicked to check if the operator is qualified to operate the
equipment during dispatch?
✔ (Green Flag) PUT IN PROCESS
Material & Goods Movement
6. What link should be clicked in the AIT app to perform a customer pick-up at the
SSA and bring materials into the unit's inventory?
✔ PGR
7. What screen title appears on the initial screen of the MIGO transaction?
✔ The screen title depends on the last movement type that was posted
Specialist (Practical Exercise) Questions
And Answers With Verified Solutions
100% Correct Rated A+
GCSS-Army Maintenance & Logistics Study Guide
Equipment Dispatch & Work Orders
1. What action cannot be performed before a Dispatch (D1) notification is saved
and a notification number is generated?
✔ The Equipment Dispatch (5987) form cannot be printed
2. What operational status symbol indicates that equipment is non-mission capable
due to a maintenance requirement?
✔ (Red Flag) NMC Maintenance
3. In a forwarded work order, which work center updates the work order status to
"R" (awaiting pickup)?
✔ The supporting work center
4. Which two fields are updated to indicate that forwarded equipment has been
picked up?
✔ The operational system condition and main work center
5. What button is clicked to check if the operator is qualified to operate the
equipment during dispatch?
✔ (Green Flag) PUT IN PROCESS
Material & Goods Movement
6. What link should be clicked in the AIT app to perform a customer pick-up at the
SSA and bring materials into the unit's inventory?
✔ PGR
7. What screen title appears on the initial screen of the MIGO transaction?
✔ The screen title depends on the last movement type that was posted