GCSS-ARMY ERPS'S COURSE TEST 1
QUESTIONS WITH VERIFIED ANSWERS.
1. A __________ is a GCSS-Army component that represents a particular Army
nn nn nn nn nn nn nn nn nn nn nn
Unit, logistics element, or cost capturing entity. - ANSWER: a. Force Element (FE)
nn nn nn nn nn nn nn nn nn nn nn nn nn
2. Which transaction code (T-Code) is used to display a Unit's Organizational
nn nn nn nn nn nn nn nn nn nn nn
structure? (Force Element, Storage Location, Property, Personnel, and what a unit
nn nn nn nn nn nn nn nn nn nn nn
is allowed to request) - ANSWER: c. /n/ISDFPS/LSP2
nn nn nn nn nn nn nn nn
3. Which transaction code (T-Code) is used to identify the details associated with a
nn nn nn nn nn nn nn nn nn nn nn nn nn
DoDAAC, MRP area, Storage Location, and supporting supply organization. -
nn nn nn nn nn nn nn nn nn nn
ANSWER: d. ZFE
nn nn nn
4. True or False? A Technical Status is set by the User to identify the severity of
nn nn nn nn nn nn nn nn nn nn nn nn nn nn nn nn
a notification (fault or shortcoming) for a piece of equipment. - ANSWER: a. True
nn nn nn nn nn nn nn nn nn nn nn nn nn nn
5. Which operational status symbol is used to indicate the equipment non-mission
nn nn nn nn nn nn nn nn nn nn nn
due to a maintenance requirement? - ANSWER: c. Red Flag
nn nn nn nn nn nn nn nn nn nn
6. Work orders are created and managed from the Equipment Situation Report.
nn nn nn nn nn nn nn nn nn nn nn
Which of the following represents a refurbishment order? - ANSWER: b. PM04
nn nn nn nn nn nn nn nn nn nn nn nn
7. True or False? A functional location structure is a hierarchical structure
nn nn nn nn nn nn nn nn nn nn nn
representation of a system/sub-system/end item. - ANSWER: a. True
nn nn nn nn nn nn nn nn nn
8. Using the Functional Location Structure example below; which equipment is
nn nn nn nn nn nn nn nn nn nn
currently NOT installed into the Functional Location Structure? - ANSWER: d. The
nn nn nn nn nn nn nn nn nn nn nn nn
transmission
nn
9. Which notification type is used to create a one-time individual equipment
nn nn nn nn nn nn nn nn nn nn nn
dispatch? - ANSWER: b. D1
nn nn nn nn nn
10. Which transaction is used to display the workflow message indicating the
nn nn nn nn nn nn nn nn nn nn nn
approval authority's equipment dispatch request decision? - ANSWER: d. SBWP
nn nn nn nn nn nn nn nn nn nn
11. Which transaction code (T-Code) is used to create a project work order? -
nn nn nn nn nn nn nn nn nn nn nn nn nn
ANSWER: d. IW31
nn nn nn
QUESTIONS WITH VERIFIED ANSWERS.
1. A __________ is a GCSS-Army component that represents a particular Army
nn nn nn nn nn nn nn nn nn nn nn
Unit, logistics element, or cost capturing entity. - ANSWER: a. Force Element (FE)
nn nn nn nn nn nn nn nn nn nn nn nn nn
2. Which transaction code (T-Code) is used to display a Unit's Organizational
nn nn nn nn nn nn nn nn nn nn nn
structure? (Force Element, Storage Location, Property, Personnel, and what a unit
nn nn nn nn nn nn nn nn nn nn nn
is allowed to request) - ANSWER: c. /n/ISDFPS/LSP2
nn nn nn nn nn nn nn nn
3. Which transaction code (T-Code) is used to identify the details associated with a
nn nn nn nn nn nn nn nn nn nn nn nn nn
DoDAAC, MRP area, Storage Location, and supporting supply organization. -
nn nn nn nn nn nn nn nn nn nn
ANSWER: d. ZFE
nn nn nn
4. True or False? A Technical Status is set by the User to identify the severity of
nn nn nn nn nn nn nn nn nn nn nn nn nn nn nn nn
a notification (fault or shortcoming) for a piece of equipment. - ANSWER: a. True
nn nn nn nn nn nn nn nn nn nn nn nn nn nn
5. Which operational status symbol is used to indicate the equipment non-mission
nn nn nn nn nn nn nn nn nn nn nn
due to a maintenance requirement? - ANSWER: c. Red Flag
nn nn nn nn nn nn nn nn nn nn
6. Work orders are created and managed from the Equipment Situation Report.
nn nn nn nn nn nn nn nn nn nn nn
Which of the following represents a refurbishment order? - ANSWER: b. PM04
nn nn nn nn nn nn nn nn nn nn nn nn
7. True or False? A functional location structure is a hierarchical structure
nn nn nn nn nn nn nn nn nn nn nn
representation of a system/sub-system/end item. - ANSWER: a. True
nn nn nn nn nn nn nn nn nn
8. Using the Functional Location Structure example below; which equipment is
nn nn nn nn nn nn nn nn nn nn
currently NOT installed into the Functional Location Structure? - ANSWER: d. The
nn nn nn nn nn nn nn nn nn nn nn nn
transmission
nn
9. Which notification type is used to create a one-time individual equipment
nn nn nn nn nn nn nn nn nn nn nn
dispatch? - ANSWER: b. D1
nn nn nn nn nn
10. Which transaction is used to display the workflow message indicating the
nn nn nn nn nn nn nn nn nn nn nn
approval authority's equipment dispatch request decision? - ANSWER: d. SBWP
nn nn nn nn nn nn nn nn nn nn
11. Which transaction code (T-Code) is used to create a project work order? -
nn nn nn nn nn nn nn nn nn nn nn nn nn
ANSWER: d. IW31
nn nn nn