• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 7 pages
Exam (elaborations)

Test 7 GCOR 14 & 15 Questions with Solutions

Document preview thumbnail
Preview 2 out of 7 pages

Exam of 7 pages for the course GCOR at GCOR (Test 7 GCOR 14 & 15)

Content preview

Test 7 GCOR 14 & 15

Smart Mobile Client - TDCOM 40.27 - answer employee’s title
Mile Post where track will be fouled, occupied or used for protect
notify that any train to be listed as "behind"
HLCS number or "none"
information regarding shunting in the control point

Absolute Signal - answer A block or interlocking signal without a number plate, or
designated by an A marker.

Track Bulletin - answer A notice of conditions affecting train movement. It may also
authorize movement against the current of traffic where rule 9.14 (Movement with the
current of traffic is in effect)

Track Warrant Control (TWC) - answer A method to authorize train movements or
protect men or machines on a main track within specified limits in a territory designated
by the timetable.

OK Time and Name on TW - answer All track warrant information including the
summary will be repeated to the train dispatcher who will check and if correct, will state
the following: "Track warrant (number) to (engine ID) (direction) is OK at (time)
(dispatcher initials)."

Where designated by the timetable, a track warrant will authorize main track use under
the direction of the: 14.1 - answerTrain dispatcher

When a station name is used to designate the first named point, authority will extend:
14.2 - answerAuthority will extend from station sign (SS) if there is a siding
Authority will extend from and including the last siding switch

Track warrants will be issued under the direction of the train dispatcher to authorize use
main track (TWC Limits) where designated by timetable. 14.1 - answertrue

Rule 6.13 (yard limits), Rule 6.14 (restricted limits) are two other methods of authority
for trains to occupy the main track TWC limits. 14.1 - answertrue

When a crew member informs the train dispatcher that the entire train has passed a
specific point: 14.3 - answerTrack warrant authority is considered void up to the point
that the train reported was passed. True

When authorized to "Work Between" two specific points, movement may be made in
only one direction between those points. 14.3 - answerFalse

, When authorized by track warrant to proceed from one point to another movement is
authorized: 14.3 - answerONLY in the direction specified

How does a train operate when issued a track warrant? 14.3 - answera and c.
a. A train may occupy the main track within designated limits
c. A train must not foul a switch at either end of the limits which may be used by an
opposing train to clear the main track.

A track warrant must not be issued to a train within the same or overlapping limits within
another train unless: 14.4 - answer1.In signaled territory all trains are authorized in the
same direction
2.Non signaled territory, ALL trains are authorized to proceed in same direction &
instructed to move at restricted speed
3.Two or more trains are authorized "work between" the specific points, move at
restricted speed within overlapping limits
4.Trains authorized to move in one direction through another train's work between & all
trains are instructed to move at restricted speed through overlapping limits

Can a train authorized by box 2 (proceed authority) be operated through the limits of a
train authorized by box 4 (bi-directional Authority)? 14.4.4 - answerYes, both trains must
be instructed to move at restricted speed by box 8(joint authority)

No more than one train may be permitted to occupy the same or overlapping limits of a
track warrant at the same time except when two or more trains authorized to "work
between" two specific points have been instructed by track warrant to move at reduced
speed within overlapping limits. 14.4 - answerfalse

In Track Warrant Control TWC, a train holding proceed authority (box 2) cannot enter
the limits of a train with work between authority (box 4) unless both trains are given a
Box 8 (joint authority), informing that the authority is joint and operate at restricted
speed within the overlapping limits. 14.4 - answertrue

A track warrant may be issued to men or equipment in the same manner as trains. 14.5
- answertrue

When box 2 (Proceed authority) is marked, it authorizes movement in either direction
between the specified points specified. 14.3.1 - answerFalse

When authorizing two or more trains by box 4 (Bi-directional authority/work between) in
the same or overlapping limits, box 8 (Joint authority) need only be checked for the first
train. The other train(s) can be told verbally to proceed at restricted speed. 14.4.2 -
answerFalse. All trains need a box 8 (Joint authority)

Can a train be authorized by track warrant box 2 (proceed authority) through the limits
of a train authorized by box 4 (bi-directional Authority/work-between)? 14.4.4 -

Document information

Uploaded on
March 14, 2025
Number of pages
7
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$14.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
julianah420
4.2
(158)
Sold
719
Followers
329
Items
36057
Last sold
2 days ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions