• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 12 pages
Exam (elaborations)

GCOR Practice Test Questions and Answers 2025

Document preview thumbnail
Preview 2 out of 12 pages

Exam of 12 pages for the course GCOR at GCOR (GCOR Practice Test)

Content preview

GCOR Practice Test

Dual Control Switch - answer A power operated switch, movable point frog, or derail
that can also be operated by hand.

Electric Switch Lock - answer An electrically controlled lock that restricts the use of a
hand operated switch or derail.

Absolute Signal - answer A block or interlocking signal without a number plate or
designated by an A marker.

Automatic Block System (ABS) - answer A series of consecutive blocks governed by
block signals, cab signals, or both. The signals are activated by a train or by certain
conditions that affect the block use.

Block - answer A length of track between consecutive block signals or between a block
signal and the end of block system limits.

Centralized Traffic Control (CTC) - answer A block system that uses block signal
indications to authorize train movements.

Control Operator - answerAn employee assigned to operate a CTC or interlocking
control machine or authorized to grant track permits.

Control Point - answerThe location of absolute signals controlled by a central operator
or a railroad identifiable point as defined in the Timetable.

Controlled Siding - answerA siding within CTC and Interlocking limits where a signal
indication authorizes the siding's use.

Controlled Signal - answerAn absolute signal controlled by a control operator.

Controlled Track - answerTrack upon which the railroad's operating rules require that all
movements of trains must be authorized by a train dispatcher or a control operator.

Crossover - answerA combination of two switches that connect two adjacent tracks.

Interlocking Signals - answerThe fixed signals of an interlocking that govern trains using
interlocking limits.

Loaded Bulk Commodity Train - answerLoaded Unit Trains are defined as a train of 50
or more loaded cars in a block, each weighing 125 tons gross weight or more (bulk
commodities), such as coal, grain, soda ash, etc.

, Main Track - answerA track extending through yards and between stations that must be
occupied without authority or protection.

Non-Controlled Track - answerTrack upon which trains are permitted by railroad rule or
special instruction to move without recieving authorization from train dispatcher or
control operator.

Off-Track Equipment - answerMachines that may be operated on the right of way foul of
track.

Proceed Indication - answerAny block signal indication that allows a train to proceed
without stopping.

Reverse Movement - answerA movement opposite the authorized direction.

Siding - answerA track connected to the main track and used for meeting or passing
trains. Locations of sidings are shown int he Timetable.

Special Instructions - answerInstructions contained in the Timetable or other
publications.

Station - answerA place designated by name in the Timetable station column.

Track Bulletin - answerA notice of coinditions affecting train movement. It may also
authorize movement against the current of traffic where rule 9.14 (movement witht he
Current of Traffic) is in effect.

Track Car - answerAny equipment which is designed to operate on the rail, other than a
Locomotive or railroad car.

Track Warrant Control (TWC) - answerA method to authorize train movements or
protect man or machines on a main track within specified limits in a territory designated
by the timeline.

Train - answerOne or more engines coupled, with or without cars, displaying a marker,
and authorized to operate ont he main track.

Yard Limit - answerA portion of main track designated by yard limit signs and time table
special instructions or a track bulletin.

Any employee operating a radio must do the following - answerBefore transmitting,
listen long enough to make sure the channel is not being used. Give the required
identification. Not proceed with further transmission until acknowledgement is received.

For Mobile Units - answerName or initials of the railroad

Document information

Uploaded on
March 14, 2025
Number of pages
12
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$14.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
julianah420
4.2
(158)
Sold
719
Followers
329
Items
36057
Last sold
2 days ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions