with Questions And Answers 2025
The purpose of Construction Quality Management is to: - Answer - Achieve the quality
established by properly developed requirements through the combined responsibility, but
seperate efforts of contractpr smd government personnel.
Construction Quality Management is the performance of tasks, which ensure that construction
is performed. - Answer - According to plans and specifications, on time, within a defined budget
and a safe work environment.
Partnering relationships are based upon: - Answer - Building trust and dedication to common
goals
It is the responsibility of Quality Assurance Personnel to: - Answer - Periodically verify that the
contractors system of control is working effectively.
An effective contractor quality control program will: - Answer - Be an incentive for work to be
done correctly the first time resulting in earlier completion, reduced field overhead costs, and
greater profits.
The success or failure of all contractors is based upon: - Answer - The ability to control costs,
finance work, estimate jobs, schedule the work, and maintain effective quality control.
Quality Assurance Personnel have the responsibility to: - Answer - Require contractors to
maintain the quality specified in the plans and specifications.
Inspection is: - Answer - The process by which ongoing and completed work is examined
, During the punch-out inspection of a project: - Answer - Quality Assurance Personnel must
assure that the contractor prepares a punch-list and makes corrections.
If there is a disagreement whether the contractors work complies with the contract: - Answer -
The government makes the final determination
Characteristics that describe a definable feature of work include: - Answer - Cross-referenced
listings to the contractors construction schedule that may have more than one definable feature
under a section of the specifications.
The _____________________ consists of daily checks of the work to assure continuing
compliance with contract requirements. - Answer - Follow-up phase
The Quality Assurance Plan: - Answer - Is a government management tool establishing staffing,
training, pre-award activities, and surveillance activities.
Testing is extremely important in construction quality management and is performed by: -
Answer - Both the contractor and the government
If the contractor does not provide an adequate superintendent, the contract allows the
contracting officer to: - Answer - Require the contractor to assume personal supervision of the
work.
The Quality Control Plan: - Answer - Is the foundation upon which quality work is based and
outlines planned quality control procedures.
Tests that are unannounced, randomly performed, and repeat quality control tests are: - Answer
- Quality Assurance tests