Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 27 pages
Exam (elaborations)

NICET LEVEL 3 EXAM 2025 | ALL QUESTIONS AND CORRECT ANSWERS | GRADED A+ | VERIFIED ANSWERS | LATEST EXAM | JUST RELEASED

Document preview thumbnail
Preview 3 out of 27 pages

NICET LEVEL 3 EXAM 2025 | ALL QUESTIONS AND CORRECT ANSWERS | GRADED A+ | VERIFIED ANSWERS | LATEST EXAM | JUST RELEASED

Content preview

NICET LEVEL 3 EXAM 2025 | ALL QUESTIONS AND
CORRECT ANSWERS | GRADED A+ | VERIFIED
ANSWERS | LATEST EXAM | JUST RELEASED

What are tendons comprised of? ---------CORRECT ANSWER-----------------
a single prestressed bar and a 1/4" duct larger then outside diameter of
prestressed bar



What should be done to post tensioned ducts if damaged? ---------
CORRECT ANSWER-----------------Seal the ducts with tape or splice
coupler over damaged section



What should be installed at the ends of the ducts? ---------CORRECT
ANSWER-----------------Inlets for grout injection and outlets to allow air to
escape, water and grout.



How big should the inlets and outlets be for post tensioning? ---------
CORRECT ANSWER-----------------3/4" for strand tendon and atleast 1/2"
for a single bar tendon



Where should inlets and outlets be placed for post tensioning? ---------
CORRECT ANSWER-----------------At the anchorage area of the tendon,
high points of the duct when vertical distance is more than 2' and outlet at
the lowest point of the duct



What should be done to the metal conduits after concrete placement for
post tensioning? ---------CORRECT ANSWER-----------------Flush conduits

,with water containing lime and blow out the again with compressed oil free
air.



When should false work be removed for post tensioned members? ---------
CORRECT ANSWER-----------------after 48 hours of grouting



Where are anchorage devices placed for post tensioning? ---------
CORRECT ANSWER-----------------must be atleast 2" inside of concrete



How long is the cure time for Class HPCO? ---------CORRECT ANSWER----
-------------wet cure for 14 days, provide internal cooling, external heating or
insulating to ensure differential does not exceed 35 degrees



How long is the cure time for Class LMC? ---------CORRECT ANSWER------
-----------wet cure atleast 48 hours and until maturity reading exceeds 48
maturity hours



What is the placement method for Class HPCO overlay? ---------CORRECT
ANSWER-----------------do not broom mortar from mixture from front edge of
placement



How large is a test section for bridge overlay? ---------CORRECT
ANSWER-----------------9x9 test section



How large is the surface profiling of a bridge? ---------CORRECT ANSWER-
----------------1/6 to 1/4"

, How large of a damaged area requires concrete removal for bridge overlay
prep? ---------CORRECT ANSWER-----------------remove concrete atleast 1"
around exposed or unbonded reinforcement



What equipment is used for surface prep for bridge overlays? ---------
CORRECT ANSWER-----------------Micro miller



How much of poor soil should be scarified from the road bed? ---------
CORRECT ANSWER-----------------6"



For slope or wave protection in what direction should geotextile be placed?
---------CORRECT ANSWER-----------------downstream



What is the geotextile overlap for above water and in water? ---------
CORRECT ANSWER-----------------12" above water and 36" overlap in
water



What should be done for damaged geotextile? ---------CORRECT
ANSWER-----------------overlap geotextile of kind beyond damaged area or
sew seam



Where should geotextile overlaps not be and how wide of the overlap? ------
---CORRECT ANSWER-----------------within the wheel path and 24" overlap

Document information

Uploaded on
March 6, 2025
Number of pages
27
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$31.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
nevilletadayo
4.6
(323)
Sold
900
Followers
458
Items
3502
Last sold
2 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions