Resource Readiness Reporting is a commander's_____________ of the unit's ability to execute the full
spectrum mission for which the unit was organized or designed, as well as the ability of a unit to
provide________________ for the entire range of missions the unit is designed for. - Answers Objective
assessment , trained personnel and required equipment
The Resource Readiness Report also communicates readiness information, specifically a unit's resources,
through category-levels and_______________ that are derived directly from authoritative data sources
(ADS) - Answers four measured resource areas
The Resource Readiness Report will be submitted via Defense Readiness Reporting System DRRS
between the ______ and _______ of each month. - Answers 1st, 15th
If the overall C-level changes after the report is completed for the month units will report these changes
within___________ of the event necessitating the change. - Answers 24 hours
The DOC Statement is a _____________ that complies Core METL, War and Mobilization Plan WMP, UTC
Availability UTA, and specific resources units are required to report. - Answers Convenient single
document
________________ generates the DOC Statement based off of authoritative data sources ADS and FAM
inputs. - Answers MAJCOM
Worksheets/briefing materials reflecting the measured unit data will be given the same
______________ as the material from which it was derived. - Answers same classification level
____________ is the office of primary responsibility OPR for AF-IT reporting. - Answers Command Post
Provide the appropriate C-level with the respective description.
____ Unit possesses the required manpower, resources and is trained to undertake the full mission for
which it is organized or designed.
____ Unit possesses the required resources and is trained to undertake most of the wartime missions
for which it is organized or designed.
____ Unit possesses the required resources and is trained to undertake many, but not all of the wartime
missions for which it is organized or designed.
____ Unit requires additional manpower, resources or training to undertake its mission, but it may be
directed to undertake portions of its mission with resources on hand.
---- Unit is undergoing a Service directed resource action and is not prepared, at this time , to undertake
the mission set for which it is organized or designed. - Answers C1,C2,C3,C4,C5
, A rating of P-6, S-6, R-6, and T-6 means that unit___________ to measure in a specific area. - Answers is
not required
Normally, the _________ level of the four measured resource areas is reported as the Overall C-level
provided it is a realistic indication of the unit's readiness ( based on the C- level definitions). - Answers
lowest
The UTC Assessment should be based off the following:
The ability to accomplish the_________
The ability to fulfill the__________
The ability to fulfill the--------- - Answers Mission capability MISCAP statement
standard manpower requirements
complete equipment requirements
Which rating completes this statement?
____ Complete UTC to include the exact MANFOR and LOGFOR equipment with only MISCAP explicit
substitutions, or green skill level, or grade subs. All required deployment training for the UTC can be
accomplished within 72 hours of notification or sooner if subject to more stringent criteria.
____ The UTC has a missing or deficient MANFOR or LOGFOR requirement, but that missing or deficient
capability does not prevent the UTC form being tasked and accomplishing its mission in a contingency
and or a AEF rotation.
____ The UTC has a missing or deficient capability that prevents the entire UTC from being tasked and
accomplishing its mission in a contingency and or AEF rotation. - Answers Green, Yellow, Red
Within ______ days of receipt of a deployment notification, UTCs tasked to deploy will submit, via ART,
an assessment of their ability to support the tasking, including theater specific requirements. - Answers
five
Units owning a UTC tasked to deploy will reset the deployment status form yes to no not later
than________ after the tasked resources in process at their home station. - Answers five calendar days
The purpose of the DRRS report is a ______________ indicating what task a unit can accomplish, based
upon the mission for which a unit was organized or designed. - Answers Capabilities based assessment
Units designate a minimum of _______ and maximum of ____ alternates for the Unit Commander role
for their unit. - Answers one,three