Construction Quality Management for Contractors UPDATED ACTUAL Exam Questions and CORRECT Answers The _________ consists of daily checks of the work to assure continuing compliance with contract requirements - CORRECT ANSWER - Follow-up Phase Design-Build contracts require - CORRECT ANSWER - The QC Manager to be in place and take an active role in the review and coordination of the desig

Content preview

Construction Quality Management for
Contractors UPDATED ACTUAL Exam
Questions and CORRECT Answers
The _________ consists of daily checks of the work to assure continuing compliance with
contract requirements - CORRECT ANSWER - Follow-up Phase



Design-Build contracts require - CORRECT ANSWER - The QC Manager to be in place
and take an active role in the review and coordination of the design.


Which of the following is included in all three phases of the Three Phases of Control? -
CORRECT ANSWER - Safety



The purpose of Construction Quality Management is to - CORRECT ANSWER - Achieve
the quality established by properly developed requirements through the combined responsibility,
but separate, efforts of contractors and government personnel


Testing is extremely important in construction quality management and is performed by -
CORRECT ANSWER - Both the contractor and the government



The primary purpose of the Three-Phase Control System is to - CORRECT ANSWER -
Require the contractor to plan, schedule, and perform quality management actions to assure work
meets all specified quality standards


Quality Assurance Personnel have the responsibility to - CORRECT ANSWER - Require
the contractor to maintain the quality specified in the plans and specifications


The _________________ is the appropriate time to assure that all materials and/or equipment
have been tested, submitted, and approved - CORRECT ANSWER - Preparatory Phase

, The Preconstruction Conference and Coordination and Mutual Understanding Meeting Are -
CORRECT ANSWER - Conducted prior to the commencement of any physical
construction work


Contractor testing procedures: - CORRECT ANSWER - Are specified in the technical
specs, outlined in the QCP, and addressed at Coordination and Mutual Understanding Meeting


The Quality Control Plan contains - CORRECT ANSWER - Identification of individual
quality quality control personnel, including name, qualifications, assigned duties, responsibilities
and authorities.


Tests that are unannounced, randomly performed, and repeat quality control tests are -
CORRECT ANSWER - Quality assurance tests


The contractor is required to conduct a Preparatory Phase Meeting before they begin any
definable feature of work except when - CORRECT ANSWER - There are no exceptions
to the rule


During the punch-out inspection of a project: - CORRECT ANSWER - Quality Control
personnel prepare and punch-list and make corrections


The Quality Control Report should include - CORRECT ANSWER - All of the above


In a design build contract, if the contractor has a question about the design, what is the process to
get an answer? - CORRECT ANSWER - Contractor submits a design verification request
to the contractor's design team


Submittals are - CORRECT ANSWER - Necessary to demonstrate that the proposed
materials, etc. are in compliance with the contract.

Document information

Uploaded on
March 2, 2025
Number of pages
5
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$10.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
STANFORDGRADESS
4.0
(238)
Sold
1590
Followers
108
Items
115164
Last sold
9 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions