questions with verified answers
___________________________ depend on project deliverables, project
constraints, milestones, budgets, etc. Ans✓✓✓ Task Relationships
______________________________ is the number of time periods required to
finish work activities that lead to the completion of the project deliverables.
Ans✓✓✓ Duration
______________________________ occurs when the calculated completion date
of the last project activity is later than the original targeted completion date.
Ans✓✓✓ Negtive Float
________________________________________ approaches are used when
there is uncertainty in how long an activity will take Ans✓✓✓ Probalistic duration
estimation
_______________activities are activities that can be performed simultaneously
because they involve different resources. Ans✓✓✓ Concurrent
A _______________________ is when you start assigning dates based on the
earliest start date, adding dates based on estimates for each task in the diagram.
Ans✓✓✓ forward pass
As the project team develops the activity ____________________, they may
divide activities or identify additional activities that need to be added to the WBS.
Ans✓✓✓ duration estimates
, Between tasks you can insert _________________ to help shorten the overall
duration. Ans✓✓✓ Lead Time
Bringing in new resources as a means of __________________ in a project results
in additional build-in time to get up to speed. Ans✓✓✓ crashing costs
Decreasing ____________________ is possible by Inspecting tasks to see if they
can be made shorter. Ans✓✓✓ Critical Path
Inspecting tasks to see if they can be made shorter is one method for reducing
what?
Total float
Resources
Critical path
Functionality Ans✓✓✓ Critical path
Lead time or _____________________________extends a link backward or
forward so that the successor task starts earlier or later than it otherwise would.
Ans✓✓✓ lag time
The ___________________ used to complete project tasks can come from within
or outside of the organization hosting the project. Ans✓✓✓ Resources