NATMI CDS - Exam 1 QUESTIONS AND ANSWERS 2025 ALL CORRECT!! Labor and material payment bonds provide the necessary protection on public projects - ANSWER TRUE Miller act corresponds with what.? - ANSWER Labor and material payment bond Architects should not advise owners and the legal sufficiency of required affidavits, waivers, or releases of liens. - ANSWER TRUE Liens are not permitted on public projects. - ANSWER TRUE Architect must review, approve, and promptly submit shop drawings required by the contract documents. - ANSWER TRUE An architect approved shop drawings which deviated from the contract documents. - ANSWER Changes in contract drawings must be submitted in writing to architect before becoming affective, not equal to revisions within shop drawings. Who is responsible for errors and omissions in shop drawings? - ANSWER General Contractor Revisions not requested by the architect on resubmitted shop drawings don't require architect's approval? - ANSWER FALSE

Content preview

NATMI CDS -
Exam 1




A
QUESTIONS AND


VI
TU
ANSWERS 2025
IS
ALL CORRECT!!
M
O
A
N




Labor and material payment bonds provide the necessary protection on public projects -
ANSWER TRUE
JP




Miller act corresponds with what.? - ANSWER Labor and material payment bond

Architects should not advise owners and the legal sufficiency of required affidavits,
waivers, or releases of liens. - ANSWER TRUE

Liens are not permitted on public projects. - ANSWER TRUE

, Architect must review, approve, and promptly submit shop drawings required by the
contract documents. - ANSWER TRUE

An architect approved shop drawings which deviated from the contract documents. -
ANSWER Changes in contract drawings must be submitted in writing to architect
before becoming affective, not equal to revisions within shop drawings.

Who is responsible for errors and omissions in shop drawings? - ANSWER General
Contractor




A
Revisions not requested by the architect on resubmitted shop drawings don't require




VI
architect's approval? - ANSWER FALSE

A contractors stamp of approval on shop drawings means that the contractor has




TU
already determined all criteria related thereto. - ANSWER FALSE

AIA document B101 is used to outline the architects service obligations? - ANSWER
TRUE
IS
The architects responsibilities are re-stated within the AIA General Conditions Doc
A201. - ANSWER TRUE
M
Contractors may not know what services the architect is obligated to perform if what
document is not part of the contract documents. - ANSWER AIA Document B101
O


In review of shop drawings the general conditions Document A201 clearly states? -
ANSWER Matters outside the scope of the design concept and the contract
A



documents are not reviewed.
N




If an architect had performed their services using stipulations of AIA documents A201 &
B141 within a ______ there should be no concern about professional liability. But
JP




general liability is different. - ANSWER Standard of care

Calendar days - ANSWER 7 / Week

Liquidated damages is a provision included in the? - ANSWER Owner-contractor
agreement. Document A101.

Document information

Uploaded on
February 28, 2025
Number of pages
9
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$10.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
JPNAOMISTUVIA
4.4
(36)
Sold
131
Followers
55
Items
1245
Last sold
2 months ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions