Rédigé par des étudiants ayant réussi Disponible immédiatement après paiement Lire en ligne ou en PDF Mauvais document ? Échangez-le gratuitement 4,6 TrustPilot
logo-home
Document preview thumbnail
Aperçu 1 sur 4 pages
Examen

NPORS 25 Test Questions and Answers Fully Solved 100%

Document preview thumbnail
Aperçu 1 sur 4 pages

When excavating, how far from the excavation should the spoil be placed? a) A distance equal to the depth of the excavation from the side of the excavation but no less than 1 metre b) As close as possible from the edge of the excavation c) At full radius of the excavators working area - Correct Answer-a) A distance equal to the depth of the excavation from the side of the excavation but no less than 1 metre Where should the driver sprockets be when travelling the excavator across site? a) At the front of the excavator when travelling b) It does not matter c) At the rear of the excavator when travelling - Correct Answer-c) At the rear of the excavator when travelling The pre-operational checks of the excavator are the responsibility of: a) The operator b) The site manager c) The fitter/ service team - Correct Answer-a) The operator What is the correct method of mounting/ dismounting the machine? - Correct AnswerUsing handholds and steps provided, using 3 points of contact facing the machine. List 5 checks that must be made to the tracks and running gear during a pre-operational check - Correct Answer-Drive sprockets in good condition and secure, track plates undamaged, top and bottom rollers move freely with no flat spots or leaks, idlers rotate and are in good condition, track tension suitable for ground conditions, hydraulic motors and pipes in good condition and leak free, tracks clear of lose debris

Aperçu du contenu

NPORS 25 Test Questions
When excavating, how far from the excavation should the spoil be placed?
a) A distance equal to the depth of the excavation from the side of the excavation but no
less than 1 metre
b) As close as possible from the edge of the excavation
c) At full radius of the excavators working area - Correct Answer-a) A distance equal to
the depth of the excavation from the side of the excavation but no less than 1 metre

Where should the driver sprockets be when travelling the excavator across site?
a) At the front of the excavator when travelling
b) It does not matter
c) At the rear of the excavator when travelling - Correct Answer-c) At the rear of the
excavator when travelling

The pre-operational checks of the excavator are the responsibility of:
a) The operator
b) The site manager
c) The fitter/ service team - Correct Answer-a) The operator

What is the correct method of mounting/ dismounting the machine? - Correct Answer-
Using handholds and steps provided, using 3 points of contact facing the machine.

List 5 checks that must be made to the tracks and running gear during a pre-operational
check - Correct Answer-Drive sprockets in good condition and secure, track plates
undamaged, top and bottom rollers move freely with no flat spots or leaks, idlers rotate
and are in good condition, track tension suitable for ground conditions, hydraulic motors
and pipes in good condition and leak free, tracks clear of lose debris.

At what intervals should your excavator be greased/ lubricated? - Correct Answer-As
stated in the excavator operation and maintenance manual

What must the operator ensure when changing an attachment using a manual or semi-
automatic quick hitch system and why? - Correct Answer-That the safety pin is replaced
and secured, to ensure that the attachment does not accidentally disconnect

Why should an operator not work "across the tracks" of the excavator at full radius? -
Correct Answer-The excavator could become unstable leading to the machine tipping
over


What colour are buried gas services?

Infos sur le Document

Publié le
25 février 2025
Nombre de pages
4
Écrit en
2024/2025
Type
Examen
Contenu
Questions et réponses
$10.19

Mauvais document ? Échangez-le gratuitement Dans les 14 jours suivant votre achat et avant le téléchargement, vous pouvez choisir un autre document. Vous pouvez simplement dépenser le montant à nouveau.
Rédigé par des étudiants ayant réussi
Disponible immédiatement après paiement
Lire en ligne ou en PDF

Seller avatar
Les scores de réputation sont basés sur le nombre de documents qu'un vendeur a vendus contre paiement ainsi que sur les avis qu'il a reçu pour ces documents. Il y a trois niveaux: Bronze, Argent et Or. Plus la réputation est bonne, plus vous pouvez faire confiance sur la qualité du travail des vendeurs.
Brainarium
3.8
(336)
Vendu
2019
Abonnés
1047
Éléments
24137
Dernière vente
13 heures de cela



Pourquoi les étudiants choisissent Stuvia

Créé par d'autres étudiants, vérifié par les avis

Une qualité sur laquelle compter : rédigé par des étudiants qui ont réussi et évalué par d'autres qui ont utilisé ce document.

Le document ne convient pas ? Choisis un autre document

Aucun souci ! Tu peux sélectionner directement un autre document qui correspond mieux à ce que tu cherches.

Paye comme tu veux, apprends aussitôt

Aucun abonnement, aucun engagement. Paye selon tes habitudes par carte de crédit et télécharge ton document PDF instantanément.

Student with book image

“Acheté, téléchargé et réussi. C'est aussi simple que ça.”

Alisha Student

Vous travaillez sur vos références ?

Créez des citations précises en APA, MLA et Harvard avec notre générateur de sources gratuit.

Vous travaillez sur vos références ?

Foire aux questions