answers A+ rated
Often, the employee closing out the PM work order verifies that - correct answer
✔✔preventative maintenance is complete
Preventative maintenance schedules would commonly include - correct answer
✔✔frequency
Making sure that a motor shaft is level - correct answer ✔✔reduces the number
of needed shims
It is important to have a/an _______ for closure of PM work orders - correct
answer ✔✔completion date
Which of the following is a goal of Total Productive Maintenance (TPM) - correct
answer ✔✔zero breakdowns and defects
When checking for out of round, any movement of the dial indicates that the -
correct answer ✔✔shaft may be out of round
A machine is expected to have downtime throughout several shifts. What is the
appropriate communication between shifts for lock out/tag out procedures? -
correct answer ✔✔verify energy state, then change lock
, A chain should be replaced when its length becomes ______ longer than the
original length - correct answer ✔✔3 percent
When lubricating a bearing, the WORST mistake would be to - correct answer
✔✔get dirt in the bearing
The most obvious indicator that V-belt pulleys are worn beyond usefulness is
when the - correct answer ✔✔belt is touching the bottom of the groove
Prior to shutting down a machine for preventative maintenance, the maintenance
technician must - correct answer ✔✔arrange for ready access of routine tools and
supplies
In a PM audit, the ______ would likely be negatively impacted if there were a
large number of uncompleted PM orders - correct answer ✔✔critical path
Daily Maintenance involves daily records because - correct answer ✔✔recurring
events can be analyzed to troubleshoot problems
Which of the following is a key planned maintenance activity - correct answer
✔✔lubricate equipment
Scheduled replacement of minor parts that tend to wear quickly is an important
part of - correct answer ✔✔preventative