Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 11 pages
Exam (elaborations)

Maintenance Study Guide questions n answers A+ rated

Document preview thumbnail
Preview 2 out of 11 pages

Maintenance Study Guide questions n answers A+ rated

Content preview

Maintenance Study Guide questions n
answers A+ rated


Often, the employee closing out the PM work order verifies that - correct answer
✔✔preventative maintenance is complete


Preventative maintenance schedules would commonly include - correct answer
✔✔frequency


Making sure that a motor shaft is level - correct answer ✔✔reduces the number
of needed shims


It is important to have a/an _______ for closure of PM work orders - correct
answer ✔✔completion date


Which of the following is a goal of Total Productive Maintenance (TPM) - correct
answer ✔✔zero breakdowns and defects


When checking for out of round, any movement of the dial indicates that the -
correct answer ✔✔shaft may be out of round


A machine is expected to have downtime throughout several shifts. What is the
appropriate communication between shifts for lock out/tag out procedures? -
correct answer ✔✔verify energy state, then change lock

, A chain should be replaced when its length becomes ______ longer than the
original length - correct answer ✔✔3 percent


When lubricating a bearing, the WORST mistake would be to - correct answer
✔✔get dirt in the bearing


The most obvious indicator that V-belt pulleys are worn beyond usefulness is
when the - correct answer ✔✔belt is touching the bottom of the groove


Prior to shutting down a machine for preventative maintenance, the maintenance
technician must - correct answer ✔✔arrange for ready access of routine tools and
supplies


In a PM audit, the ______ would likely be negatively impacted if there were a
large number of uncompleted PM orders - correct answer ✔✔critical path


Daily Maintenance involves daily records because - correct answer ✔✔recurring
events can be analyzed to troubleshoot problems


Which of the following is a key planned maintenance activity - correct answer
✔✔lubricate equipment


Scheduled replacement of minor parts that tend to wear quickly is an important
part of - correct answer ✔✔preventative

Document information

Uploaded on
February 25, 2025
Number of pages
11
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$17.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
BravelRadon
3.5
(162)
Sold
947
Followers
540
Items
51912
Last sold
4 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions