PJM GENERATOR EXAM (ACTUAL 2025)
QUESTIONS AND VERIFIED ANSWERS
The purpose of the Deploy All Resources Action is to instruct
all generating resources to be on line and at full output
_________
immediately upon receipt of dispatch instruction
A Heavy Load Voltage Schedule Warning has been issued for
the PJM RTO. Generation Operators should:
Ensure all unit voltage regulators are in service
When submitting expected capability data for "new" units,
what reactive capability should be used?
Vendor supplied D-curves
If reactive testing for a facility is done at different times, how
long does the owner have to complete all required testing?
6 months
, One of the leading causes of the 1999 Low Voltage event in
PJM was_____________.
PJM's EMS at that time had only nameplate "D"-curve data
for generating unit reactive capabilities
During the PJM Peak Period Maintenance Season what is the
maximum amount of consecutive days the outage can last?
9
When an outage requires verbal notification to PJM which
PJM personnel should be contacted?
Master Coordinator
Real time transmission constraints or contingencies may be
alleviated with generators operating ________.
off cost (out of merit)
Monitoring LMP may give insights into ________.
QUESTIONS AND VERIFIED ANSWERS
The purpose of the Deploy All Resources Action is to instruct
all generating resources to be on line and at full output
_________
immediately upon receipt of dispatch instruction
A Heavy Load Voltage Schedule Warning has been issued for
the PJM RTO. Generation Operators should:
Ensure all unit voltage regulators are in service
When submitting expected capability data for "new" units,
what reactive capability should be used?
Vendor supplied D-curves
If reactive testing for a facility is done at different times, how
long does the owner have to complete all required testing?
6 months
, One of the leading causes of the 1999 Low Voltage event in
PJM was_____________.
PJM's EMS at that time had only nameplate "D"-curve data
for generating unit reactive capabilities
During the PJM Peak Period Maintenance Season what is the
maximum amount of consecutive days the outage can last?
9
When an outage requires verbal notification to PJM which
PJM personnel should be contacted?
Master Coordinator
Real time transmission constraints or contingencies may be
alleviated with generators operating ________.
off cost (out of merit)
Monitoring LMP may give insights into ________.