• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 28 pages
Exam (elaborations)

LEED v4 GA Practice Exam 100 Questions & Answers all correct.(2025)

Document preview thumbnail
Preview 3 out of 28 pages

LEED v4 GA Practice Exam 100 Questions & Answers all correct.(2025)

Content preview

LEED v4 GA Practice Exam 100 Questions & Answers all correct.(2025)

All of the following are part of the USGBC's policy regarding the use of their officially
registered logo, except:
A. The logo is provided by the USGBC
B. The logo may only refer to a USGBC program or product
C. The logo signifies endorsement by the USGBC
D. All uses of the logo must include a trademark, except when repeated logos in the same
document
E. The USGBC logo is less prominent in a document than the logo of the user - (ANSWER)C.
The logo signifies endorsement by the USGBC


A mixed use project is proposed吗?还是指某个特定的词或概念
with one story or level of residential apartments over ground
floor retail core and shell space.?
Which LEED rating system should the team use to certify the
project?
A. LEED Homes: Lowrise
B. LEED BD+C: New Construction
C. LEED BD+C: Core & Shell
D. LEED Neighborhood Development - (ANSWER)B. LEED BD+C: New Construction


The primary project team member responsible for managing the documentation for a project in
LEED Online is known as the _________________________.
A. LEED Project Analyst
B. LEED Project Assistant
C. LEED Project Ombudsman
D. LEED Project Administrator - (ANSWER)D. LEED Project Administrator


Which one of the following refers to a way of analyzing the environmental, social, and local
impact of a material or product?
A. Impact cycle assessment
B. Life cycle costs

,C. Life cycle assessment
D. Purchasing of ongoing consumables - (ANSWER)C. Life cycle assessment


Which of the following is not a rapidly renewable material?
A. Wool
B. Teak
C. Bamboo
D. Cork - (ANSWER)B. Teak


Buildings in the US account for what percent of total electricity use?
A. 55%
吗?还是指某个特定的词或概念
B. 68%
?
C. 72%
D. 80% - (ANSWER)C. 72%


Post-consumer recycled content is:________________.
A. Sourced from residential and commercial waste
B. Sourced from wholesale dealers
C. Sourced from manufacturing waste or by-products
D. Sourced from secondary market distributors - (ANSWER)A. Sourced from residential and
commercial waste


Buildings in the US account for what percent of municipal solid waste?
A. 60%
B. 55%
C. 45%
D. 30% - (ANSWER)D. 30%


Which one of the following defines nonpotable water?

, A. Water that meets drinking water standards
B. Water that does not meet drinking water standards
C. Greywater that has been treated on site to meet drinking water standards
D. Rainwater harvesting - (ANSWER)B. Water that does not meet drinking water standards


Which of the following are examples of pre-consumer recycled content products? (Select 3)
A. Concrete with fly ash from coal-fired power plants
B. Metal studs made from scrapped automobiles
C. Particle board made from old shipping pallets
D. Acoustical wall panel made with by-product from a plastic bottle manufacturing plant
E. Asphalt paving with reprocessed asphalt removed from old parking lot
吗?还是指某个特定的词或概念
F. Insulation made of scrap from denim jean manufacturing - (ANSWER)A, D, F
?
A. Concrete with fly ash from coal-fired power plants
D. Acoustical wall panel made with by-product from a plastic bottle
F. Insulation made of scrap from denim jean manufacturing


All of the following are typical elements of a Construction and Demolition Waste Management
Plan, except:
A. A waste diversion goal
B. Identification of types of waste to be generated during construction
C. An estimate of the total weight or volume of each type of waste to be generated during
construction
D. Identification of local resources for recycling and salvage of materials
E. Communication plan to increase participation by jobsite personnel - (ANSWER)C. An
estimate of the total weight or volume of each type of waste to be generated during
construction


A developer is proposing a new office building on a former industrial site less than 1/4 mile from
downtown, but a freeway separates the site from the restaurant and shopping district. In order to
improve the community connectivity of this project, the developer could:

Document information

Uploaded on
February 24, 2025
Number of pages
28
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$24.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
StudyGiant
4.3
(71)
Sold
7480
Followers
7
Items
3376
Last sold
1 week ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions