• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 17 pages
Exam (elaborations)

ACI Concrete Field Testing Technician- Grade I Questions And Answers.

Document preview thumbnail
Preview 3 out of 17 pages

ACI Concrete Field Testing Technician- Grade I Questions And Answers.

Content preview

ACI Concrete Field Testing Technician-
Grade I Questions And Answers


The sensor of the temperature measuring device shall be
submerged a minimum of _____ in. [_____mm] into the
freshly mixed concrete. - (correct answer) -3 in. [75 mm]

The temperature measuring device shall have a capacity
of measuring temperature of freshly mixed concrete to +-
_____ degrees F [+- _____ C] throughout a range of _____. -
(correct answer) -1 degree F [0.5 C], 30 degrees F to 120 F
[0 C to 50 C]

The temperature measuring device shall be calibrated
_____, or whenever there is a question of _____. - (correct
answer) -Annually, accuracy

The temperature of concrete may be measured in a
wheelbarrow. True or False? - (correct answer) -True

The temperature of concrete may be measured in a wall
form. True of False - (correct answer) -True

A composite sample of concrete is required even if the
only purpose for obtaining the sample is to determine
temperature. True of False? - (correct answer) -False

What must be done to the sample container prior to
sampling the concrete? - (correct answer) -Dampen (with
water)

What must be done to the concrete surrounding the
temperature measuring device after the device is

,submerged in the fresh concrete. - (correct answer) -
Gently press the concrete around the temperature
measuring device at the surface of the concrete

How long must the temperature measuring device remain
in the freshly mixed concrete? - (correct answer) -At least
2 minutes but not more than 5 minutes

After the temperature of the concrete is read, what is
required? - (correct answer) -Reporting of temperature

The temperature of concrete is reported to the nearest
_____ degrees F [_____ C] - (correct answer) -1 degree F [0.5
C]

According to ASTM C1064, what is one reason to take the
temperature of concrete? - (correct answer) -Verify
conformance to a specified requirement for temperature
of concrete

A maximum temperature of freshly mixed concrete is
specified in ASTM C1064. True of False? - (correct answer)
-False

The sample of concrete used for temperature
determination must be rodded 25 times. True or False? -
(correct answer) -False

Sampling by this method is required when tests are to be
made to determine _____ with specification requirements. -
(correct answer) -Compliance

This method covers sampling from four types of mixtures
which are _____, _____, _____, and _____. - (correct answer) -
Stationary mixers, paving mixers, revolving drum mixers,
and open top mixers

, The maximum allowable time between obtaining the first
and final portions of a composite sample is _____ minutes. -
(correct answer) -15

Portions of a composite sample shall be thoroughly
remixed bfore beginning tests on the sample. True of
False? - (correct answer) -True

The maximum elapsed time allowed between obtaining
the final portion of the composite sample and beginning
the tests for slump, temperature, and air content is _____
minutes. - (correct answer) -5

The molding of strength test specimens shall begin within
_____ minutes after fabricating the composite sample. -
(correct answer) -15

The concrete sample must be protected from
contamination and _____. - (correct answer) -Rapid
evaporation

The minimum size sample for making strength test
specimens is _____. - (correct answer) -28 L (1ft^3)

When sampling from a stationary mixer, the batch must
be sampled at _____ or more regularly spaced intervals
during discharge of the middle portion of the batch -
(correct answer) -2

The composite sample for a paving mixer must represent a
minimum of _____ different portions of the batch of
concrete taken from the pile after discharge. - (correct
answer) -5

When sampling from a revolving drum truck mixer,
concrete must be sampled at a minimum of _____ regularly
spaced intervals during discharge of the middle portion of
this batch. - (correct answer) -2

Document information

Uploaded on
February 23, 2025
Number of pages
17
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$12.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Wisdoms
4.5
(306)
Sold
802
Followers
65
Items
6973
Last sold
1 day ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions