Earthwork has to do with the roadway in what way? - Correct Answer-Earthwork is the excavation and placement of soils and materials supporting the proposed roadway. In Earthwork what is a lift? - Correct Answer-6" of compacted depth at full width In Earthwork what is a Lot? - Correct Answer-A lot is 1 lift at 500 ft or within compacted area. Isolated compaction operations are separate lots. Sampling at the roadway is done for - Correct Answer-Done for base, sub grade, and embankment. Sampling is determined how - Correct Answer-generated with random numbers usually by a Verification Inspector Basics covered in Level 1 - Correct Answer-Nuclear Testing Speedy Moisture Report Forms What is important about sampling at the roadway - Correct Answer-Minimum of three representative sample combined.

Content preview

FDOT Earthwork Level 1 2025 Update
Earthwork has to do with the roadway in what way? - Correct Answer-Earthwork is the
excavation and placement of soils and materials supporting the proposed roadway.

In Earthwork what is a lift? - Correct Answer-6" of compacted depth at full width

In Earthwork what is a Lot? - Correct Answer-A lot is 1 lift at 500 ft or within compacted
area. Isolated compaction operations are separate lots.

Sampling at the roadway is done for - Correct Answer-Done for base, sub grade, and
embankment.

Sampling is determined how - Correct Answer-generated with random numbers usually
by a Verification Inspector

Basics covered in Level 1 - Correct Answer-Nuclear Testing
Speedy Moisture
Report Forms


What is important about sampling at the roadway - Correct Answer-Minimum of three
representative sample combined.

What is LIMS? - Correct Answer-Laboratory Info Management System

The proctor theory is when compaction is achieved how - Correct Answer-by inputting
energy to expel air and water in the soil voids

Compaction causes - Correct Answer-An increase in unit weight, decrease in
compressibility and permeability.

The proctor is determined where and creates what - Correct Answer-In a laboratory and
establishes a density standard to be used on the roadway

Lab proctors are created how - Correct Answer-Material is gathered from the road and
prepared with different amounts of water then placed in molds and hammered

What is a modified proctor used in - Correct Answer-It is used in base, sub grade, MSE
wall back fill materials

Modified proctors are created how - Correct Answer-With a 10lb hammer(rammer) on a
18" drop with 56 blows per layers with 5 layers in total.

, What is a standard proctor used in - Correct Answer-It is used in embankment and
structure back fill materials

Standard proctors are created how - Correct Answer-With a 5.5lb hammer(rammer) on
a 12" drop with 25 blows per layer with 3 layers in total

Comparison between VT and QC density test tolerance - Correct Answer-2 lbs/pcf

What is the STRG - Correct Answer-Sampling, Testing, and Reporting Guide (state
wide)

A job guide schedule is - Correct Answer-project specific

The material identification number for embankment in the laboratory is - Correct
Answer-004L

The material identification number for embankment in the field is - Correct Answer-004F

The material identification number for base is - Correct Answer-030

PP is short for - Correct Answer-project personel

Sampling in the field it is important to - Correct Answer-sample each type of material
and have enough for a representative sample

When to secure samples - Correct Answer-After material is placed but before
compaction effort is applied

Sample transmittal card the source uses what code for the jobsite - Correct Answer-08

For material description the minimum is always - Correct Answer-Color and texture

On sample bags be sure to put - Correct Answer-Project #
Sample #
Location

What is the document that itemizes the minimum requirements for sampling and
testing? - Correct Answer-Sampling, testing, reporting guide

Unit weight is - Correct Answer-the weight of a material occupying a volume

Wet density - Correct Answer-is the weight of soil and water in a volume

Dry density - Correct Answer-weight of soil solids in a volume

Moisture content - Correct Answer-amount of water in the soil in the volume

Document information

Uploaded on
February 22, 2025
Number of pages
6
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$8.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
quizletquizizzy
5.0
(1)
Sold
9
Followers
0
Items
517
Last sold
6 months ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions