NASCLA - Contractors Guide to Business, Law, &
Project Management Exam Questions &
Answers Latest Updated
Save
Practice questions for this set
Learn 4 /7 Study with Learn
mechanical and electrical
Give this one a try later!
Trades that typically have the most stringent and specialized coordination
requirement for project closeout are:
Fiber glass insulation batts are being installed in an attic. Where should the vapor
2
barrier be installed?
A surveying benchmark is at 88.6 feet. There is a reference stake set 7.8 feet lower
than the benchmark. If a ditch is to be excavated to a depth of 8.75 feet below the
3
reference stake and 20 feet from the reference stake, what is the finished elevation
of the bottom of the ditch?
, In order to protect the owner and contractor from lien filings, what document is
4
provided by a subcontractor in exchange for final payment?
Don't know?
Terms in this set (109)
A business must meet the 1
requirement of the Fair
Labor Standards Act
when there are more
than how many
employees?
What is the primary to control moisture
purpose of ventilating
unconditioned spaces?
Oxygen cylinders shall separate from fuel gas cylinders by a minimum of 20'
be stored where?
Which of the following is the company's administrative expenses
included in a company's
general overhead costs?
What size diameter 2 1/2"
anchor bolts should
open web joists have at
each end?
When should duplex nails when building concrete forms
be used?
Where would the technical specifications
contractor find details fo
wall penetrations that are
to be constructed as a
part of the project?
, Trades that typically have mechanical and electrical
the most stringent and
specialized coordination
requirement for project
closeout are:
When forming waffle pan forms
slabs in a multi-story
building which of the
following should be
used?
Fiber glass insulation under the insulation
batts are being installed
in an attic. Where should
the vapor barrier be
installed?
A crane is operating near 10'
overhead power lines
rate less than 50 kV. What
is the required minimum
distance?
It is allowable to 2 feet
excavate how far below a
trench box?
When storing steel joist vertical, laid flat, or as shipped
at a job site they should
be:
An installed truss has a 1.5 "
20' span and a depth of
6'. What is the maximum
amount it can be out of
plumb?
What does the term a percentage of the progress payment withheld by
retainage mean? the owner
Project Management Exam Questions &
Answers Latest Updated
Save
Practice questions for this set
Learn 4 /7 Study with Learn
mechanical and electrical
Give this one a try later!
Trades that typically have the most stringent and specialized coordination
requirement for project closeout are:
Fiber glass insulation batts are being installed in an attic. Where should the vapor
2
barrier be installed?
A surveying benchmark is at 88.6 feet. There is a reference stake set 7.8 feet lower
than the benchmark. If a ditch is to be excavated to a depth of 8.75 feet below the
3
reference stake and 20 feet from the reference stake, what is the finished elevation
of the bottom of the ditch?
, In order to protect the owner and contractor from lien filings, what document is
4
provided by a subcontractor in exchange for final payment?
Don't know?
Terms in this set (109)
A business must meet the 1
requirement of the Fair
Labor Standards Act
when there are more
than how many
employees?
What is the primary to control moisture
purpose of ventilating
unconditioned spaces?
Oxygen cylinders shall separate from fuel gas cylinders by a minimum of 20'
be stored where?
Which of the following is the company's administrative expenses
included in a company's
general overhead costs?
What size diameter 2 1/2"
anchor bolts should
open web joists have at
each end?
When should duplex nails when building concrete forms
be used?
Where would the technical specifications
contractor find details fo
wall penetrations that are
to be constructed as a
part of the project?
, Trades that typically have mechanical and electrical
the most stringent and
specialized coordination
requirement for project
closeout are:
When forming waffle pan forms
slabs in a multi-story
building which of the
following should be
used?
Fiber glass insulation under the insulation
batts are being installed
in an attic. Where should
the vapor barrier be
installed?
A crane is operating near 10'
overhead power lines
rate less than 50 kV. What
is the required minimum
distance?
It is allowable to 2 feet
excavate how far below a
trench box?
When storing steel joist vertical, laid flat, or as shipped
at a job site they should
be:
An installed truss has a 1.5 "
20' span and a depth of
6'. What is the maximum
amount it can be out of
plumb?
What does the term a percentage of the progress payment withheld by
retainage mean? the owner