What 10 When stretching a 2nd line for a large store fire on the 1st floor of an OLT,
where is it positioned? - ✔️✔️When assured that it won't be needed on the 1st floor it
may be advanced to the floor above
Units arrive at 2 story flat roof PD with fire on the top floor. Which member brings the 1st
saw to the roof? - ✔️✔️2nd due Roof FF. Location of fire does not matter for a flat roof,
the 2nd due brings saw
When utilizing Positive Pressure Ventilation (PPV) to pressurize the attack stairway at a
fire operation, what is the optimum placement of the Positive Pressure Fan (PPF)? -
✔️✔️4' to 6' from attack stairwell door on the ground floor at an angle tilt of 80 degrees
(remember keep fan a hook's distance away)
code is transmitted for fire in a high rise MD? - ✔️✔️10-77
What 10 code is transmitted for a fire in a high rise office building? - ✔️✔️10-76
What are the criteria for a mayday? - ✔️✔️I O U My Life.
Imminent collapse
Occurred collapse
Unresponsive member
Missing member
Lost member
What are the criteria for an urgent transmission? - ✔️✔️BLIFE
Backing out (interior attack discontinued)
Loss of water
Injured member (non life threatening)
Fear of collapse
Fire in exposures
If a top floor fire at a brownstone with no fire escapes, where does 2nd OV go after
checking the rear? - ✔️✔️To the roof to assist with ventilation
or
into an exposure to check for extension
For a fire at a brownstone that is not top floor and has fire escapes, what does 2nd OV
do after checking rear? - ✔️✔️Teams up with 2nd roof to enter apartment above fire
What is the field of view for the TIC? The focal point? - ✔️✔️50 degree field of view.