Stuvia.com - The Marketplace
BGBG BGBG BGBG BGBG to Buy
BGBG BGBG and Sell
BGBG
your Study Material
Downloaded by: Bookista |
BGBG BGBG BGBG Want to
BGBG earn
BGBG
BGBG BGBG $1.236
Distribution of this document is illegal extra per year?
, Stuvia.com - The Marketplace
BGBG BGBG BGBG BGBG to Buy
BGBG and
BGBG Sell
BGBG
your Study Material
CONTENTS
New BGBG to the
BGBG BGBG Fourth BGBG Edition 1
Chapter 1: Construction Financial Management
BGBG BGBG BGBG 2
Chapter 2: Construction Accounting Systems
BGBG B GB G BGBG 4
Chapter 3: Accounting
BGBG BGBG Transactions 7
Chapter 4: More BGBG BGBG Construction BGBG Accounting 23
Chapter 5: Depreciation
BGBG 34
Chapter 6: Analysis of Financial Statements
BGBG BGBG BGBG BGBG 50
Chapter 7: Managing
BGBG BGBG Costs 58
Chapter 8: Determining
BGBG BGBG Labor B G BG Burden 62
Chapter 9: Managing
BG BG BGBG General Overhead BGBG BG BG Costs 65
Chapter 10: Setting BGBG BG BG Profit B G B G Margins B G B G for B GB G Bidding 67
Chapter 11: Profit B GB G B G B G Center BGBG Analysis 70
Chapter 12: Cash Flows For
BGBG BGBG BGBG BGBG Construction Projects BGBG 75
Chapter 13: Projecting
B GB G BG BG Income BGBG Taxes 87
Chapter 14: Cash Flows
B GB G BGBG B GB G for BGB G a BGBG Construction Company BGBG 91
Chapter 15: Time BGBG BGBG Value BGBG of Money B GBG 93
Chapter 16: FinancingBGBG BGBG a BGBG Company’s Financial Needs BGBG B GB G 99
Chapter 17: Making BGBG BGBG Financial Decisions BGBG 111
Chapter 18: Income BGBG BGBG Taxes and BGBG BGBG Financial Decisions BGBG 130
Downloaded by: Bookista | BGBG BGBG BGBG Want to
BGBG earn
BGBG
BGBG BGBG $1.236
Distribution of this document is illegal extra per year?
, Stuvia.com - The Marketplace BGBG BGBG BGBG BGBG to BGBG Buy BGBG and BGBG Sell
your Study Material
New to the Fourth Edition BGBG BGBG BGBG BGBG
The major BGBG BGBG changes to the fourth edition include the following
BGBG BGBG BGBG BG BG BGBG BGBG BGBG
The business failure rate for construction companies in Chapterj
BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG
1 have beenupdated.
BGBG BGBG BGBG
Sections on cost segregation and bonus depreciation have been added to
BGBG B GB G BGBG B G BG BGBG BGBG BGBG BGBG B G BG BGBG
Chapter 5.
BGBG BGBG
The discussion of typical median ratios in Chapter 6 has been updated.
BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG B GBG BGBG
A section on the monitoring and controlling process has been added to
BGBG B GBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG
Chapter 7.
BGBG BGBG
A section on managing design-build costs has been added to Chapter 7.
BGBG B GB G BGBG BGBG BGBG BGBG BGBG BGBG B GB G B G B G BGBG
The wages, social security, and Medicare costs were updated in
BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG
Chapters 8, 9,and 14.
BGBG BGBG BGBG BGBG
A weekly cash flow problem has been added to Chapter 12.
BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG
The income tax regulations in Chapter 13 have been updated
BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG
to incorporateprovisions of The Tax Cuts and Jobs Act passed
BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG B G B G
in December 2017.
B G B G BGBG BGBG
The project cash flows used to develop an annual cash flow
BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG
for a construction company have been expanded to cover
BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG
the entire project (including work done inthe prior year) and
BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG
the calculation of the underbillings/overbillingsj has been
BGBG BGBG BGBG BGBG BGBG BGBG BGBG
included in Chapterj 14.
BGBG B G B G BGBG BGBG
The effects ofj taxes on decision has been updated in
BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG B G B G
Chapterj 18 to incorporate theTax Cuts and Jobs Act.
BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG
The Instructor’s Manual includes a list of learning objectives, instructional
BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG
hints, suggested activities, and resources forj each chapter. Files for the
BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG
figures and tables in the
BGBG textbook
BGBG are found on
BGBG the instructor’s BGBG BGBG B G B G B G B G B G B G B G B G B G B G B G B G
website. It is my hope that these resources will make it easier
B G B G B G B G B G B G B G B G B G B G B G B G B G B G BGBG BGBG BGBG BGBG BGBG
for course instructors to teach the material in a
BGBG BGBG BGBG meaningful manner. BGBG BGBG BGBG BGBG BGBG BGBG B G B G B G B G
Because
B G B G the courses that use this textbook
B G B G are quite B G B G B G B G B G B G B G B G B G B G B G B G B G B G
diverse, it is impossible to organize the chapters into one best order.
B G B G B G B G BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG
Each instructor should consider
BGBG BGBG his or her individual program and
BGBG BGBG B G B G B G B G B G B G B G B G B G B G BGBG
determine which chapters need to be taught and in what order.
B G B G B G B G BGBG B G B G B G B G B G B G BGBG BGBG B G B G BGBG BGBG
Best BGBG wishes,
Steven J. BGBG BGBG Peterson, MBA, BGBG BGBG PE
Chapter 1: Construction Financial Management BGBG BGBG BGBG BGBG
Learning Objectives BGBG
At BGBG the completion of this chapter the student
BGBG BGBG BGBG BGBG BGBG BGBG BGBG should be BGBG BGBG able to: BGBG
Explain why financial management
BGBG BGBG BGBG B G B G is so BGBG B G B G important to BGBG BGBG a construction
BGBG
company.
BGBG
Downloaded by: Bookista | BGBG BGBG BGBG Want BGBG to earn
BGBG
BGBG BGBG $1.236
Distribution of this document is illegal extra per year?
, Stuvia.com - The Marketplace BGBG BGBG BGBG BGBG to BGBG Buy BGBG and BGBG Sell
your Study Material
Explain why financial management is different for construction
BGBG BGBG BGBG B G B G BGBG BGBG BGBG
companies than formost other industries.
BGBG BGBG BGBG B G B G BGBG
Understand that all managerial employees from the owner to
BGBG B G B G BGBG BGBG BGBG BGBG BGBG BGBG
the crew forepersonplay a role in financial management ofj a
BGBG BGBG BGBG BGBG BGBG B G B G BGBG BGBG BGBG BGBG
construction company.
BGBG BGBG
Instructional Hints BGBG
Compare a construction company to a manufacturing plant.
BGBG BGBG BGBG BGBG BGBG BGBG BGBG
Emphasize the differences between a construction company and a
BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG
manufacturing plant, particularly: construction companies build
BGBG BGBG BGBG BGBG BGBG BGBG
unique products and the equipment isnot usually stationary at
BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG
single location. These are the reasons
BGBG BGBG a construction companyBGBG BGBG BGBG BGBG B G B G BGBG BGBG
needsj a job cost system and an equipment cost system.
BGBG BGBG B G B G BGBG BGBG BGBG BGBG BGBG BGBG BGBG
Activities
Invite a financial manager (for example, an accountant or general
BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG
manager) from aconstruction company to your class to discussj
BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG
their role as a financial manager.
BGBG BGBG BGBG BGBG B G B G BGBG
Have each student interview a management employee forj a
BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG
construction company.The interviews should include owners, project
BGBG BGBG BGBG BGBG BGBG BGBG BGBG
managers, superintendents, and forepersons. Each student is to
BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG
find out how the employee contributes to the financial
BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG
management of the company. Discuss their findings in class.
BGBG BGBG BGBG BGBG BGBG BGBG B G B G BGBG BGBG
Instruction Resources BGBG
The figures from this chapter in electronic format and
BGBG BGBG BGBG BGBG BGBG BGBG BGBG B G B G
PowerPoint slides can befound at the instructor’s website.
BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG
Data on construction failures can be obtained from the Surety
BGBG BGBG BGBG BGBG BGBG BGBG B G B G BGBG B G B G
Information Office(www.sio.org).
BGBG BGBG
Current data on construction company failures can be found atj
BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG
http://www.census.gov/ces/dataproducts/bds/data_firm.html. The most
B G B G BGBG BGBG
useful datacomes from reports that include the sector (e.g., Sector,
BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG
Firm Age by
BGBG Sector, and Firm Size by Sector) because
BGBG BGBG B G B G BGBG BGBG BGBG BGBG BGBG BGBG
construction can be separated from other industries.
BGBG BGBG BGBG BGBG BGBG BGBG B G B G
Solutions toj the Textbook Problems
BGBG BGBG BGBG BGBG
1. They are: 1) ineffective financial management systems, 2) bank
BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG
line ofj
BGBG creditsconstantly borrowed to the limits, 3) poor
BGBG B G B G BGBG BGBG BGBG BGBG BGBG BGBG
estimating and/or job cost reporting,
BGBG BGBG BGBG BGBG BGBG
4) poor project management, and 5) no comprehensive business plan.
BGBG BGBG BGBG BGB G B GB G BGBG BGBG B G BG BGBG
Downloaded by: Bookista | BGBG BGBG BGBG Want to
BGBG earn
BGBG
BGBG BGBG $1.236
Distribution of this document is illegal extra per year?
BGBG BGBG BGBG BGBG to Buy
BGBG BGBG and Sell
BGBG
your Study Material
Downloaded by: Bookista |
BGBG BGBG BGBG Want to
BGBG earn
BGBG
BGBG BGBG $1.236
Distribution of this document is illegal extra per year?
, Stuvia.com - The Marketplace
BGBG BGBG BGBG BGBG to Buy
BGBG and
BGBG Sell
BGBG
your Study Material
CONTENTS
New BGBG to the
BGBG BGBG Fourth BGBG Edition 1
Chapter 1: Construction Financial Management
BGBG BGBG BGBG 2
Chapter 2: Construction Accounting Systems
BGBG B GB G BGBG 4
Chapter 3: Accounting
BGBG BGBG Transactions 7
Chapter 4: More BGBG BGBG Construction BGBG Accounting 23
Chapter 5: Depreciation
BGBG 34
Chapter 6: Analysis of Financial Statements
BGBG BGBG BGBG BGBG 50
Chapter 7: Managing
BGBG BGBG Costs 58
Chapter 8: Determining
BGBG BGBG Labor B G BG Burden 62
Chapter 9: Managing
BG BG BGBG General Overhead BGBG BG BG Costs 65
Chapter 10: Setting BGBG BG BG Profit B G B G Margins B G B G for B GB G Bidding 67
Chapter 11: Profit B GB G B G B G Center BGBG Analysis 70
Chapter 12: Cash Flows For
BGBG BGBG BGBG BGBG Construction Projects BGBG 75
Chapter 13: Projecting
B GB G BG BG Income BGBG Taxes 87
Chapter 14: Cash Flows
B GB G BGBG B GB G for BGB G a BGBG Construction Company BGBG 91
Chapter 15: Time BGBG BGBG Value BGBG of Money B GBG 93
Chapter 16: FinancingBGBG BGBG a BGBG Company’s Financial Needs BGBG B GB G 99
Chapter 17: Making BGBG BGBG Financial Decisions BGBG 111
Chapter 18: Income BGBG BGBG Taxes and BGBG BGBG Financial Decisions BGBG 130
Downloaded by: Bookista | BGBG BGBG BGBG Want to
BGBG earn
BGBG
BGBG BGBG $1.236
Distribution of this document is illegal extra per year?
, Stuvia.com - The Marketplace BGBG BGBG BGBG BGBG to BGBG Buy BGBG and BGBG Sell
your Study Material
New to the Fourth Edition BGBG BGBG BGBG BGBG
The major BGBG BGBG changes to the fourth edition include the following
BGBG BGBG BGBG BG BG BGBG BGBG BGBG
The business failure rate for construction companies in Chapterj
BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG
1 have beenupdated.
BGBG BGBG BGBG
Sections on cost segregation and bonus depreciation have been added to
BGBG B GB G BGBG B G BG BGBG BGBG BGBG BGBG B G BG BGBG
Chapter 5.
BGBG BGBG
The discussion of typical median ratios in Chapter 6 has been updated.
BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG B GBG BGBG
A section on the monitoring and controlling process has been added to
BGBG B GBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG
Chapter 7.
BGBG BGBG
A section on managing design-build costs has been added to Chapter 7.
BGBG B GB G BGBG BGBG BGBG BGBG BGBG BGBG B GB G B G B G BGBG
The wages, social security, and Medicare costs were updated in
BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG
Chapters 8, 9,and 14.
BGBG BGBG BGBG BGBG
A weekly cash flow problem has been added to Chapter 12.
BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG
The income tax regulations in Chapter 13 have been updated
BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG
to incorporateprovisions of The Tax Cuts and Jobs Act passed
BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG B G B G
in December 2017.
B G B G BGBG BGBG
The project cash flows used to develop an annual cash flow
BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG
for a construction company have been expanded to cover
BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG
the entire project (including work done inthe prior year) and
BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG
the calculation of the underbillings/overbillingsj has been
BGBG BGBG BGBG BGBG BGBG BGBG BGBG
included in Chapterj 14.
BGBG B G B G BGBG BGBG
The effects ofj taxes on decision has been updated in
BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG B G B G
Chapterj 18 to incorporate theTax Cuts and Jobs Act.
BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG
The Instructor’s Manual includes a list of learning objectives, instructional
BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG
hints, suggested activities, and resources forj each chapter. Files for the
BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG
figures and tables in the
BGBG textbook
BGBG are found on
BGBG the instructor’s BGBG BGBG B G B G B G B G B G B G B G B G B G B G B G B G
website. It is my hope that these resources will make it easier
B G B G B G B G B G B G B G B G B G B G B G B G B G B G BGBG BGBG BGBG BGBG BGBG
for course instructors to teach the material in a
BGBG BGBG BGBG meaningful manner. BGBG BGBG BGBG BGBG BGBG BGBG B G B G B G B G
Because
B G B G the courses that use this textbook
B G B G are quite B G B G B G B G B G B G B G B G B G B G B G B G B G B G
diverse, it is impossible to organize the chapters into one best order.
B G B G B G B G BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG
Each instructor should consider
BGBG BGBG his or her individual program and
BGBG BGBG B G B G B G B G B G B G B G B G B G B G BGBG
determine which chapters need to be taught and in what order.
B G B G B G B G BGBG B G B G B G B G B G B G BGBG BGBG B G B G BGBG BGBG
Best BGBG wishes,
Steven J. BGBG BGBG Peterson, MBA, BGBG BGBG PE
Chapter 1: Construction Financial Management BGBG BGBG BGBG BGBG
Learning Objectives BGBG
At BGBG the completion of this chapter the student
BGBG BGBG BGBG BGBG BGBG BGBG BGBG should be BGBG BGBG able to: BGBG
Explain why financial management
BGBG BGBG BGBG B G B G is so BGBG B G B G important to BGBG BGBG a construction
BGBG
company.
BGBG
Downloaded by: Bookista | BGBG BGBG BGBG Want BGBG to earn
BGBG
BGBG BGBG $1.236
Distribution of this document is illegal extra per year?
, Stuvia.com - The Marketplace BGBG BGBG BGBG BGBG to BGBG Buy BGBG and BGBG Sell
your Study Material
Explain why financial management is different for construction
BGBG BGBG BGBG B G B G BGBG BGBG BGBG
companies than formost other industries.
BGBG BGBG BGBG B G B G BGBG
Understand that all managerial employees from the owner to
BGBG B G B G BGBG BGBG BGBG BGBG BGBG BGBG
the crew forepersonplay a role in financial management ofj a
BGBG BGBG BGBG BGBG BGBG B G B G BGBG BGBG BGBG BGBG
construction company.
BGBG BGBG
Instructional Hints BGBG
Compare a construction company to a manufacturing plant.
BGBG BGBG BGBG BGBG BGBG BGBG BGBG
Emphasize the differences between a construction company and a
BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG
manufacturing plant, particularly: construction companies build
BGBG BGBG BGBG BGBG BGBG BGBG
unique products and the equipment isnot usually stationary at
BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG
single location. These are the reasons
BGBG BGBG a construction companyBGBG BGBG BGBG BGBG B G B G BGBG BGBG
needsj a job cost system and an equipment cost system.
BGBG BGBG B G B G BGBG BGBG BGBG BGBG BGBG BGBG BGBG
Activities
Invite a financial manager (for example, an accountant or general
BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG
manager) from aconstruction company to your class to discussj
BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG
their role as a financial manager.
BGBG BGBG BGBG BGBG B G B G BGBG
Have each student interview a management employee forj a
BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG
construction company.The interviews should include owners, project
BGBG BGBG BGBG BGBG BGBG BGBG BGBG
managers, superintendents, and forepersons. Each student is to
BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG
find out how the employee contributes to the financial
BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG
management of the company. Discuss their findings in class.
BGBG BGBG BGBG BGBG BGBG BGBG B G B G BGBG BGBG
Instruction Resources BGBG
The figures from this chapter in electronic format and
BGBG BGBG BGBG BGBG BGBG BGBG BGBG B G B G
PowerPoint slides can befound at the instructor’s website.
BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG
Data on construction failures can be obtained from the Surety
BGBG BGBG BGBG BGBG BGBG BGBG B G B G BGBG B G B G
Information Office(www.sio.org).
BGBG BGBG
Current data on construction company failures can be found atj
BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG
http://www.census.gov/ces/dataproducts/bds/data_firm.html. The most
B G B G BGBG BGBG
useful datacomes from reports that include the sector (e.g., Sector,
BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG
Firm Age by
BGBG Sector, and Firm Size by Sector) because
BGBG BGBG B G B G BGBG BGBG BGBG BGBG BGBG BGBG
construction can be separated from other industries.
BGBG BGBG BGBG BGBG BGBG BGBG B G B G
Solutions toj the Textbook Problems
BGBG BGBG BGBG BGBG
1. They are: 1) ineffective financial management systems, 2) bank
BGBG BGBG BGBG BGBG BGBG BGBG BGBG BGBG
line ofj
BGBG creditsconstantly borrowed to the limits, 3) poor
BGBG B G B G BGBG BGBG BGBG BGBG BGBG BGBG
estimating and/or job cost reporting,
BGBG BGBG BGBG BGBG BGBG
4) poor project management, and 5) no comprehensive business plan.
BGBG BGBG BGBG BGB G B GB G BGBG BGBG B G BG BGBG
Downloaded by: Bookista | BGBG BGBG BGBG Want to
BGBG earn
BGBG
BGBG BGBG $1.236
Distribution of this document is illegal extra per year?