Lead based paint - (correct answer) - 1.0 mg/cm2 or 0.5%
xz xz xz xz xz xz xzxz xz xz xz
blood lead level - (correct answer) - 10 ug/dl (NH) 5ug/dl (CDC)
xz xz xz xz xz xz xzxz xz xz xz xz
Preliminary clearance - (correct answer) - After hazards removed
xz xz xz xz xz xzxz xz xz
final clearance - (correct answer) - Painted, sealed, cleaned, ready for reoccupancy
xz xz xz xz xz xzxz xz xz xz xz xz
Hazard - (correct answer) - Deteriorated, friction/impact; chewing
xz xz xz xz xzxz xz xz
Lead inspector job description - (correct answer) - Create lead reports
xz xz xz xz xz xz xz xzxz xz xz
Risk Assessors job description - (correct answer) -
xz xz xz xz xz xz xz
Identify risk and make recommendations to abatement methods
xzxz xz xz xz xz xz xz xz
Abatement - (correct answer) - xz xz xz xz
Permanent removal of hazards (20 years) enclosure, encapsulation, removal, replacement, remove pai
xzxz xz xz xz xz xz xz xz xz xz xz xz
nt
enclosure - (correct answer) - xz xz xz xz
Vinyl, paneling, drywall, luan, plywood, glued, screwed, chalked. NO WALLPAPER
xzxz xz xz xz xz xz xz xz xz xz
Encapsulation - (correct answer) - Substrate must be stable and strong (fiberlock)
xz xz xz xz xzxz xz xz xz xz xz xz
Interim controls - (correct answer) - Temporary, waiting for abatement (inspect every year)
xz xz xz xz xz xzxz xz xz xz xz xz xz
LBP location methods - (correct answer) - XRF, dust sample, soil sample, paint chip sample
xz xz xz xz xz xz xzxz xz xz xz xz xz xz xz
Parts of window - (correct answer) - Stop, sill, apron, header, parting bead, casing, trough, well
xz xz xz xz xz xz xzxz xz xz xz xz xz xz xz xz
Parts of door - (correct answer) - Casing, jamb, hardware, threshold
xz xz xz xz xz xz xzxz xz xz xz
Parts of stairs - (correct answer) - Treat, riser, spindle, newel post, balusters
xz xz xz xz xz xz xzxz xz xz xz xz xz
chewable - (correct answer) - Between 6" and 4" - protrudes 1/2 " and is horizontal
xz xz xz xz xzxz xz xz xz xz xz xz xz xz xz xz
Lead sources - (correct answer) - Pipes, water, paint, dust, soil, pottery, stained glass, toys, antiques
xz xz xz xz xz xzxz xz xz xz xz xz xz xz xz xz
Drinking water lead - (correct answer) - Often from pipes, let water run, use cold water
xz xz xz xz xz xz xzxz xz xz xz xz xz xz xz xz
Most common source of childhood lee poisoning - (correct answer) - dust
xz xz xz xz xz xz xz xz xz xz xzxz
Lead based paint - (correct answer) - 1.0 mg/cm2 or 0.5%
xz xz xz xz xz xz xzxz xz xz xz
blood lead level - (correct answer) - 10 ug/dl (NH) 5ug/dl (CDC)
xz xz xz xz xz xz xzxz xz xz xz xz
Preliminary clearance - (correct answer) - After hazards removed
xz xz xz xz xz xzxz xz xz
final clearance - (correct answer) - Painted, sealed, cleaned, ready for reoccupancy
xz xz xz xz xz xzxz xz xz xz xz xz
Hazard - (correct answer) - Deteriorated, friction/impact; chewing
xz xz xz xz xzxz xz xz
Lead inspector job description - (correct answer) - Create lead reports
xz xz xz xz xz xz xz xzxz xz xz
Risk Assessors job description - (correct answer) -
xz xz xz xz xz xz xz
Identify risk and make recommendations to abatement methods
xzxz xz xz xz xz xz xz xz
Abatement - (correct answer) - xz xz xz xz
Permanent removal of hazards (20 years) enclosure, encapsulation, removal, replacement, remove pai
xzxz xz xz xz xz xz xz xz xz xz xz xz
nt
enclosure - (correct answer) - xz xz xz xz
Vinyl, paneling, drywall, luan, plywood, glued, screwed, chalked. NO WALLPAPER
xzxz xz xz xz xz xz xz xz xz xz
Encapsulation - (correct answer) - Substrate must be stable and strong (fiberlock)
xz xz xz xz xzxz xz xz xz xz xz xz
Interim controls - (correct answer) - Temporary, waiting for abatement (inspect every year)
xz xz xz xz xz xzxz xz xz xz xz xz xz
LBP location methods - (correct answer) - XRF, dust sample, soil sample, paint chip sample
xz xz xz xz xz xz xzxz xz xz xz xz xz xz xz
Parts of window - (correct answer) - Stop, sill, apron, header, parting bead, casing, trough, well
xz xz xz xz xz xz xzxz xz xz xz xz xz xz xz xz
Parts of door - (correct answer) - Casing, jamb, hardware, threshold
xz xz xz xz xz xz xzxz xz xz xz
Parts of stairs - (correct answer) - Treat, riser, spindle, newel post, balusters
xz xz xz xz xz xz xzxz xz xz xz xz xz
chewable - (correct answer) - Between 6" and 4" - protrudes 1/2 " and is horizontal
xz xz xz xz xzxz xz xz xz xz xz xz xz xz xz xz
Lead sources - (correct answer) - Pipes, water, paint, dust, soil, pottery, stained glass, toys, antiques
xz xz xz xz xz xzxz xz xz xz xz xz xz xz xz xz
Drinking water lead - (correct answer) - Often from pipes, let water run, use cold water
xz xz xz xz xz xz xzxz xz xz xz xz xz xz xz xz
Most common source of childhood lee poisoning - (correct answer) - dust
xz xz xz xz xz xz xz xz xz xz xzxz