• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 5 pages
Exam (elaborations)

Asphalt Paving Level 1 Exam Questions with Verified Solutions

Document preview thumbnail
Preview 2 out of 5 pages

Asphalt Paving Level 1 Exam Questions with Verified Solutions

Content preview

Asphalt Paving Level 1 Exam
Questions with Verified Solutions
A full lot of super pave asphalt is what size?
1,000 tons
1,000 to 2000 tons
2000 to 4000 tons
1 days production - -2000 to 4000 tons

- Which is not typically used as an asphalt binder in fdot mix designs?
PG 52-28
PG 58-22
PG 62-22
PG 76-22(PMA)
PG 82-22 (PMA) - -PG 62-22

- Who cuts the density cores used for verification testing?
The verification technician
The contractor
The independent verification testing technician
None of the above - -The contractor

- A full lot is composed of 5 sublots and 4 cores per lot T/F - -False

- What is the most important for consistent compaction of asphalt mix?
The mix is hotter in temperature
The mix is colder in temperature
The mix is uniform in temperature
Temperature of the mix does not affect compaction - -The mix is uniform in
temperature

- Referring to general stationing guidelines, R1 would be ____ than R2
Closer to centerline
Closer to outside shoulder
Closure to the inside shoulder
Both A and C - -Both A and C

- While using the rolling straightedge, if the needle goes in the red zone
indicating an unacceptable high spot in the section, you then - -Mark the
pavement where the needle first goes into the red zone and place another
mark where the needle leaves the red zone and continue

- For bridge approach slabs, the 15 foot manual straightedge should be set
so ____ is on the bridge deck.

, 1 inch
Exactly 1/2 of the straightedge
The entire straightedge
None of the above - -1 inch

- For the first transverse joint on a project place the ___ on the new
pavement while overlapping the transverse joint by one inch.
4 foot level
15 foot manual straight edge
Rolling straightedge
All the above - -15 foot manual straight edge

- When calibrating to check the low side of the rolling straight edge:
Place shims under the outer wheels
Place the rolling straight edge on a surface that looks flat
Place a 3/16 inch shin under each outside wheel, the gauge should read zero
on both sides of the gauge
Place shims under the center wheel - -Place a 3/16 inch shin under each
outside wheel, the gauge should read zero on both sides of the gauge

- When calibrating to check the high side of the rolling straight edge:
Place shims under the outer wheels
Place shims under the center wheel
Place the rolling straight edge on a surface that looks flat
Place a 3/16 inch shin under the center wheel. The gauge should read zero
on both sides of the gauge. - -Place a 3/16 inch shim under the center
wheel. The gauge should read zero on both sides of the gauge.

- What do you need to know when manually checking the cross slope?
The level length
The lane width
Height from the end of the level to pavement surface
The diameter of the bubble in the level - -Level length and height from the
end of level to pavement surface

- When paving 5 foot wide shoulders or open-graded friction course FC-5
cores should be taken at the frequency of...
1 per 100 feet
5 per lot
5 per sub lot
1 per 1000 feet
None of the above - -None of the above

- Density cores for acceptance testing are not required for:
Mix less than 1 inch thick
Shoulders less than 5 feet wide

Document information

Uploaded on
February 18, 2025
Number of pages
5
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$8.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
AccurateScores
3.7
(123)
Sold
593
Followers
336
Items
15242
Last sold
21 hours ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions