When a construction project is "put out" for bid, the contractors are given the
plans and specifications for the project. If any deviations for these specifications
occur, who will be held responsible and may be required to correct them at their
own expense? - ans -The contractor
The ______ for a protect are interpreted as a legal document that specifically
defines the responsibilities of the owner and his representatives intended for the
project and what the contractors responsibilities are. - ans -specifications
The CSI-MASTERFORMAT divides the specifications into __________ specific
divisions to provide a standard reference and filing numbers for bidding and
contract forms. - ans -50
Which of the following would appear as a heading in the index of the General
Clauses and Conditions sections of General Requirements? - ans -All of these (
General Conditions, Notice to Bidders and Proposal)
_________ is the contractors price for performing the work as specified. - ans -
The proposal
"Contract Documents" "Insurance," "payments," and "Guarantee" are some
typical items that would be included under what heading in the General Clauses
and Conditions section? - ans -General Conditions
The square footage method of estimating is always recommended for lump-sum
contracts. - ans -False
The typical _______ provides the necessary control devices for the accumulation
of estimates into the final bid. - ans -Estimate summary sheet
, What type of estimate is an accurate estimating method that consists of listing all
material and labor needed for an element of work or project - ans -Detailed
Survey
_________ estimates are used as a check to determine if sufficient materials are
available to construct or complete a project. - ans -Material
Which of the following are types of labor estimates?
I. Preliminary manpower estimates
II. Detailed manpower estimates
III.Production manpower estimates - ans -I and II only
The satisfactory completion of the work for the stand number of dollars in a lump-
sum contract remains the obligation of the contractor regardless of the troubles
that may be experienced in the course of construction activities. - ans -True
The summary account can be updated on a ________ basis. - ans -All of these (
monthly, weekly, daily)
Responsibility for job progress typically lies with ________. - ans -the project
engineer
The area of ________ is one that many times presents more problems for the
contractor then any other, and this problem generally arises from the contractors
failure to document these formally. - ans -change orders
Which of the following is a Network Analysis technique of project planning,
scheduling, and control that is widely used in the construction industry. - ans -All
of these (Critical Path Analysis, Critical Path Method, and Project Evaluation and
Review Technique)
When analyzing a project, planning and scheduling should always be two
separate, distinct operations, and scheduling must always precede planning. - ans
-True
An ______ is used to represent any sequencing of prioritizes among the activities
that constitute a project. - ans -network
2025 ACTUAL EXAM COMPLETE 100 QUESTIONS
AND CORRECT DETAILED ANSWERS (VERIFIED
ANSWERS) |ALREADY GRADED A+
When a construction project is "put out" for bid, the contractors are given the
plans and specifications for the project. If any deviations for these specifications
occur, who will be held responsible and may be required to correct them at their
own expense? - ans -The contractor
The ______ for a protect are interpreted as a legal document that specifically
defines the responsibilities of the owner and his representatives intended for the
project and what the contractors responsibilities are. - ans -specifications
The CSI-MASTERFORMAT divides the specifications into __________ specific
divisions to provide a standard reference and filing numbers for bidding and
contract forms. - ans -50
Which of the following would appear as a heading in the index of the General
Clauses and Conditions sections of General Requirements? - ans -All of these (
General Conditions, Notice to Bidders and Proposal)
_________ is the contractors price for performing the work as specified. - ans -
The proposal
"Contract Documents" "Insurance," "payments," and "Guarantee" are some
typical items that would be included under what heading in the General Clauses
and Conditions section? - ans -General Conditions
The square footage method of estimating is always recommended for lump-sum
contracts. - ans -False
The typical _______ provides the necessary control devices for the accumulation
of estimates into the final bid. - ans -Estimate summary sheet
, What type of estimate is an accurate estimating method that consists of listing all
material and labor needed for an element of work or project - ans -Detailed
Survey
_________ estimates are used as a check to determine if sufficient materials are
available to construct or complete a project. - ans -Material
Which of the following are types of labor estimates?
I. Preliminary manpower estimates
II. Detailed manpower estimates
III.Production manpower estimates - ans -I and II only
The satisfactory completion of the work for the stand number of dollars in a lump-
sum contract remains the obligation of the contractor regardless of the troubles
that may be experienced in the course of construction activities. - ans -True
The summary account can be updated on a ________ basis. - ans -All of these (
monthly, weekly, daily)
Responsibility for job progress typically lies with ________. - ans -the project
engineer
The area of ________ is one that many times presents more problems for the
contractor then any other, and this problem generally arises from the contractors
failure to document these formally. - ans -change orders
Which of the following is a Network Analysis technique of project planning,
scheduling, and control that is widely used in the construction industry. - ans -All
of these (Critical Path Analysis, Critical Path Method, and Project Evaluation and
Review Technique)
When analyzing a project, planning and scheduling should always be two
separate, distinct operations, and scheduling must always precede planning. - ans
-True
An ______ is used to represent any sequencing of prioritizes among the activities
that constitute a project. - ans -network