True/False
According to the NERC Functional Model, there is no difference between the
function and the entity.
A) True
B) False - (ANSWER)B) False
True/False
Analysis type questions are designed to be the least complex from a human
cognitive process.
A) True
B) False - (ANSWER)B) False
True/False
,A Transmission Service Provider is an entity that both owns and operates
transmission facilities on the Bulk Electric System.
A) True
B) False - (ANSWER)B) False
True/False
The NERC Functional Model is designed so that the functions of Generator Owner
and Generator Operator can be performed by two different entities.
A) True
B) False - (ANSWER)A) True
How many forms of identification are required when taking the NERC System
Operator Certification exam?
A) 4
B) 9
C) 1
D) 2 - (ANSWER)2
,The NERC came into existence as a result of the Electric Power Reliability Act of
what year?
A) 1958
B) 2005
C) 1967
D) 1997 - (ANSWER)1967
How many certification credentials does NERC have examinations for?
A) 2
B) 4
C) 6
D) 3 - (ANSWER)4
Match the acronym with the appropriate organization.
FERC North American Electric Reliability Corp
NERC Florida Reliability Coordinating Council
FRCC Reliability First
, RF Federal Energy Regulatory Commission - (ANSWER)1. FERC Federal Energy
Regulatory Commission
2. NERC North American Electric Reliability Corporation
3. FRCC Florida Reliability Coordinating Council
4. RF Reliability First
True/False
Balancing Authorities are responsible to ensure that transmission facilities are
operated within the limits that are established by the Transmission Owners. -
(ANSWER)False
The first power pool in the industry was created in 1927 and was known as which
of the following? - (ANSWER)Pennsylvania-New Jersey Interconnection
How many Interconnections are there in North America?
A) 4
B) 6
C) 2
D) 8 - (ANSWER)A) 4
True/False
CONTAINS 4 DIFFERENT ALREADY TESTED
VERSIONS WITH EXPERT VERIFIED QUESTIONS AND
ANSWERS | GUARANTEED PASS| ALREADY
GRADED A | LATEST UPDATE
True/False
According to the NERC Functional Model, there is no difference between the
function and the entity.
A) True
B) False - (ANSWER)B) False
True/False
Analysis type questions are designed to be the least complex from a human
cognitive process.
A) True
B) False - (ANSWER)B) False
True/False
,A Transmission Service Provider is an entity that both owns and operates
transmission facilities on the Bulk Electric System.
A) True
B) False - (ANSWER)B) False
True/False
The NERC Functional Model is designed so that the functions of Generator Owner
and Generator Operator can be performed by two different entities.
A) True
B) False - (ANSWER)A) True
How many forms of identification are required when taking the NERC System
Operator Certification exam?
A) 4
B) 9
C) 1
D) 2 - (ANSWER)2
,The NERC came into existence as a result of the Electric Power Reliability Act of
what year?
A) 1958
B) 2005
C) 1967
D) 1997 - (ANSWER)1967
How many certification credentials does NERC have examinations for?
A) 2
B) 4
C) 6
D) 3 - (ANSWER)4
Match the acronym with the appropriate organization.
FERC North American Electric Reliability Corp
NERC Florida Reliability Coordinating Council
FRCC Reliability First
, RF Federal Energy Regulatory Commission - (ANSWER)1. FERC Federal Energy
Regulatory Commission
2. NERC North American Electric Reliability Corporation
3. FRCC Florida Reliability Coordinating Council
4. RF Reliability First
True/False
Balancing Authorities are responsible to ensure that transmission facilities are
operated within the limits that are established by the Transmission Owners. -
(ANSWER)False
The first power pool in the industry was created in 1927 and was known as which
of the following? - (ANSWER)Pennsylvania-New Jersey Interconnection
How many Interconnections are there in North America?
A) 4
B) 6
C) 2
D) 8 - (ANSWER)A) 4