Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 14 pages
Exam (elaborations)

CSLB Concrete C8 License Practice Test #2 (Latest 2025 / 2026 Update) Real Questions and Verified Answers | 100% Correct | Already Graded A+.

Document preview thumbnail
Preview 2 out of 14 pages

CSLB Concrete C8 License Practice Test #2 (Latest 2025 / 2026 Update) Real Questions and Verified Answers | 100% Correct | Already Graded A+.

Content preview

CSLB Concrete C8 License Practice Test #2
(Latest Update) Real Questions and
Verified Answers | 100% Correct | Already Graded
A+.

Save




Terms in this set (81)


The maximum size of the 1/3
conduit or pipe shall NOT
exceed _______ of the
thickness of the concrete.

Which of the following Color Test
tests for concrete is
conducted at the Explanation:
site/field? Rest of the above are laboratory tests.

If the concrete 85
compressive strength
specified is less than 3600
psi, it has the option of
being tested at 28 days
and is able to accept the
concrete if it attains
___________ percentage of the
minimum required
strength.

, If the admixtures are used Retarders
in concrete for the
purpose of delayed
setting and hardening of
concrete, they are called
_____________?

ALL ANSWERS!
Which of the following are
the general types of
-Internal vibrators
vibrating needles that are
-Immersion vibrators
in use?
-Surface vibrators

Concrete proportioning is ALL OF THESE
done based on the
facilities available at the -Surface area method
site. Which are the general -Mix design based on flexural strength
proportioning methods -Maximum destiny method
used for concrete?

The minimum cementitious 675
material that is required
for concrete bridging
deck is ______________lbs/cu
yd.

310
The amount of free water
used in concrete shall not
Explanation:
exceed ____________ pounds
If the SCM are added, it can be increased to 20
per cubic yard of
pounds per each required 100 pounds of cementitious
concrete.
material in excess of 550 pounds per cubic yard.

If the concrete curbs are Steel dowels
to be constructed over
the existing pavement,
_______________ are used to fix
them to pavement.

Document information

Uploaded on
February 9, 2025
Number of pages
14
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$15.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Drvivek
4.5
(230)
Sold
197
Followers
1
Items
187
Last sold
6 months ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions