• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 7 pages
Exam (elaborations)

Cesswi 2 || A Verified A+ Pass.

Document preview thumbnail
Preview 2 out of 7 pages

Temporary stabilization correct answers stone or plastic as a BMP to reduce erosion by stabilizing areas that will lay bare for an extended amount of time. EX. stockpiles, dikes, dams 5 types of plans correct answers 1. SWPPP 2. erosion and sed. plan (ESCP) 3. drainage plan/grading plan 4. spill prevention control and countermeasure plan (SPCC) 5. MS4 stormwater management plan/program (SWMP) SWPPP correct answers -required by NPDES for industrial, multi sector, and construction general permits -addresses operations that come in contact with stormwater and specific BMPs for reduction or elimination of discharges -site specific -identifies features, site activities and pollutants of concern Erosion & sediment control plan (ESCP) correct answers -a component of a construction permit -can sometimes be a part of an industrial permit (ex mining) -shows all required E&S controls; including design, placement, and details Drainage/ grading plans correct answers -a component of the swppp -is used for inspection of MS4 stormwater systems - sometimes combined with ESCP Spill Prevention Control and Countermeasures Plan correct answers -part of construction permit OR -part of industrial multi sector permit -may be included in MS4 permits (housekeeping) -details all spill prevention measures on site -details spill clean up -details training requirements of staff -details good housekeeping BMPs MS4 SMP correct answers -outline 6 minimum control measures for phase II municipalities -outlines all requirements of implementing a stormwater program for phase I municipalities or sites (ex. hospitals, universities, or POTWs) -details post construction inspection requirements, maintenance, pollution prevention, good housekeeping, IDDE inspections components of a plan correct answers -table of contents -ESC plan -certification -NOI

Content preview

CESSWI 2 || A VERIFIED A+ PASS.
Temporary stabilization correct answers stone or plastic as a BMP to reduce erosion by
stabilizing areas that will lay bare for an extended amount of time. EX. stockpiles, dikes, dams

5 types of plans correct answers 1. SWPPP
2. erosion and sed. plan (ESCP)
3. drainage plan/grading plan
4. spill prevention control and countermeasure plan (SPCC)
5. MS4 stormwater management plan/program (SWMP)

SWPPP correct answers -required by NPDES for industrial, multi sector, and construction
general permits
-addresses operations that come in contact with stormwater and specific BMPs for reduction or
elimination of discharges
-site specific
-identifies features, site activities and pollutants of concern

Erosion & sediment control plan (ESCP) correct answers -a component of a construction permit
-can sometimes be a part of an industrial permit (ex mining)
-shows all required E&S controls; including design, placement, and details

Drainage/ grading plans correct answers -a component of the swppp
-is used for inspection of MS4 stormwater systems
- sometimes combined with ESCP

Spill Prevention Control and Countermeasures Plan correct answers -part of construction permit
OR
-part of industrial multi sector permit
-may be included in MS4 permits (housekeeping)
-details all spill prevention measures on site
-details spill clean up
-details training requirements of staff
-details good housekeeping BMPs

MS4 SMP correct answers -outline 6 minimum control measures for phase II municipalities
-outlines all requirements of implementing a stormwater program for phase I municipalities or
sites (ex. hospitals, universities, or POTWs)
-details post construction inspection requirements, maintenance, pollution prevention, good
housekeeping, IDDE inspections

components of a plan correct answers -table of contents
-ESC plan
-certification
-NOI

, -site specific info (soils, topography, utilities, limits of project, runoff coefficient, receiving
waters and quality, environmental assessment)
-project infor
-disturbed areas of the project
-scheduling of construction activities
-maintenance schedule of BMPs

A plan certification correct answers identifies the person or persons responsible for
implementation

pollutants of concern correct answers sediment, turbidity, hydrocarbons, biological, nutrients,
metals, pH

MS4 may list TMDL requirements for the following pollutants correct answers solid waste,
temperature, Haz waste, trash, construction material handling, organics

example of a visible pollutants correct answers sediment or turbidity

example of non-visible pollutant correct answers pH

Categories of BMPs correct answers -site planning and management (training/ scheduling)
-erosion control
-sediment control
-runoff control
-good housekeeping
-post construction

SWPPP amendments correct answers -changes in area of disturbance
-inadequate or additional BMPs
-new identified pollutants
-changes in drainage areas
-post- con BMP changes
-changes in project duration

Reportable Quantities of fuel/oil (NOT incl. gasoline) correct answers land- 25 gal
water- visible sheen

reporatable quantity of gasoline, antifreeze, battery acid, refrigerant, engine degreasers correct
answers air, land, water- 100lbs (13 gal)

termination of coverage qualifications correct answers -final stabilization achieved
-transfer of coverage
-for multi sector industrial "no exposure"

direction of sheet flow correct answers is always perpendicular to the contour lines

Document information

Uploaded on
February 6, 2025
Number of pages
7
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$11.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
SirAnton
3.7
(118)
Sold
807
Followers
438
Items
40068
Last sold
3 weeks ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions