Composition flashing (base flashing) should be fastened with: -Correct Answer One- inch solid cap-head nails or Nails driven theough tin disks Pitch pockets or pitch boxes: -Correct Answer Are not recommended because they require extensive maintenance Reinforced concrete can be used as a structural deck. Which of the following is a correct statement? -Correct Answer Some moisture will remain in concrete decks even after the surface is dry Roofing insulation and membranes must be protected from latent moisture in concrete decks. In northern climates, this is usually accomplished with: -Correct Answer A vapor retarder or A venting sheet Steel decks should be at least _______ or heavier. -Correct Answer 22g Insulation applied to steel roof decks before the roof membrane is installed should be applied: -Correct Answer In two separate layers where insulation thickness permits The top flanges of a steel roof deck should be installed: -Correct Answer Perpendicular to the roof slope The maximum deflection allowed for a steel deck is: -Correct Answer 1/4" per 100 feet If the steel decks must be spot-welded to structural steel, puddle welds _______ or larger in diameter are recommended. They should be made on washers and spaced at least _______ on center. -Correct Answer 1/2 inches ... 12 inches If thermosetting insulation is used over structural decks, the density should be: -Correct Answer 18 to 22 pounds per cubic foot The correct density for thermosetting insulation is accomplished by: -Correct Answer Compacting Thermosetting insulation is compacted in two layers if the total thickness is greater than: -Correct Answer 6 inches Thermosetting insulative fills must be protected from latent moisture in roof decks. Which of the following procedures is recommended? -Correct Answer Install base-ply vapor barrier and Install wood nailers at all perimeters and Install wood nailers at all roof projections What type of roof is recommended over thermosetting insulative fills -Correct Answer Aggregate A span rating of _______ means that a plywood panel may be used for roof decking over supports spaced 32 inches o.c. or for sub flooring over supports spaced 16 inches o.c. -Correct Answer 32/16 On plywood decks not covered with insulation, a base ply should be _______ to serve as as the base ply of the roof membrane. -Correct Answer Attached with annular-threaded nails The choice of membrane type for a roof is frequently determined by: -Correct Answer Geographical location and Climate Technical information useful in the selection of roof membranes is provided by the: -Correct Answer National Bureau of Standards On low-sloped roofs, felt should be laid _______ the flow of water, beginning at _______ points in the deck. -Correct Answer Perpendicular ... low On slopes over 2 inches per foot, felt should be laid: -Correct Answer Parallel to the slopes For asphalt roofs, treated wood nailers should be installed perpendicular to the slope and on 20 - foot centers for slopes up to: -Correct Answer 3 inches per foot A roofing contractor discovers damage done by other trades to a newly installed roof. What should the roofing contractor do? -Correct Answer Submit a written report to the general contractor and/or the owner for any visible damage When layers of felt are joined by hot-mopping, the process is most similar to: -Correct Answer Welding

Content preview

Roofing


C-39 Roofing Trade Practice Test 1 Questions
and Answers UPDATED 2025
Composition flashing (base flashing) should be fastened with: -Correct Answer ✔One-
inch solid cap-head nails or

Nails driven theough tin disks

Pitch pockets or pitch boxes: -Correct Answer ✔Are not recommended because they
require extensive maintenance

Reinforced concrete can be used as a structural deck. Which of the following is a
correct statement? -Correct Answer ✔Some moisture will remain in concrete decks
even after the surface is dry

Roofing insulation and membranes must be protected from latent moisture in concrete
decks. In northern climates, this is usually accomplished with: -Correct Answer ✔A
vapor retarder or

A venting sheet

Steel decks should be at least _______ or heavier. -Correct Answer ✔22g

Insulation applied to steel roof decks before the roof membrane is installed should be
applied: -Correct Answer ✔In two separate layers where insulation thickness permits

The top flanges of a steel roof deck should be installed: -Correct Answer
✔Perpendicular to the roof slope

The maximum deflection allowed for a steel deck is: -Correct Answer ✔1/4" per 100 feet

If the steel decks must be spot-welded to structural steel, puddle welds _______ or
larger in diameter are recommended. They should be made on washers and spaced at
least _______ on center. -Correct Answer ✔1/2 inches ... 12 inches

If thermosetting insulation is used over structural decks, the density should be: -Correct
Answer ✔18 to 22 pounds per cubic foot

The correct density for thermosetting insulation is accomplished by: -Correct Answer
✔Compacting

Thermosetting insulation is compacted in two layers if the total thickness is greater than:
-Correct Answer ✔6 inches


Roofing

, Roofing



Thermosetting insulative fills must be protected from latent moisture in roof decks.
Which of the following procedures is recommended? -Correct Answer ✔Install base-ply
vapor barrier and

Install wood nailers at all perimeters and

Install wood nailers at all roof projections

What type of roof is recommended over thermosetting insulative fills -Correct Answer
✔Aggregate

A span rating of _______ means that a plywood panel may be used for roof decking
over supports spaced 32 inches o.c. or for sub flooring over supports spaced 16 inches
o.c. -Correct Answer ✔32/16

On plywood decks not covered with insulation, a base ply should be _______ to serve
as as the base ply of the roof membrane. -Correct Answer ✔Attached with annular-
threaded nails

The choice of membrane type for a roof is frequently determined by: -Correct Answer
✔Geographical location and

Climate

Technical information useful in the selection of roof membranes is provided by the: -
Correct Answer ✔National Bureau of Standards

On low-sloped roofs, felt should be laid _______ the flow of water, beginning at
_______ points in the deck. -Correct Answer ✔Perpendicular ... low

On slopes over 2 inches per foot, felt should be laid: -Correct Answer ✔Parallel to the
slopes

For asphalt roofs, treated wood nailers should be installed perpendicular to the slope
and on 20 - foot centers for slopes up to: -Correct Answer ✔3 inches per foot

A roofing contractor discovers damage done by other trades to a newly installed roof.
What should the roofing contractor do? -Correct Answer ✔Submit a written report to the
general contractor and/or the owner for any visible damage

When layers of felt are joined by hot-mopping, the process is most similar to: -Correct
Answer ✔Welding




Roofing

Document information

Uploaded on
January 31, 2025
Number of pages
8
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$13.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
PossibleA
3.9
(153)
Sold
1082
Followers
651
Items
14129
Last sold
4 days ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions