ARE 5.0 - PA - Practice Test UPDATED ACTUAL Exam Questions and CORRECT Answers The minimum land area for a project - CORRECT ANSWER - Found by dividing the total number of dwelling units needed for a project by the acceptable number of dwelling units per acre. 50'-0" - CORRECT ANSWER - A cul-de-sac must be designed so that a large motorhome can come in and turn around. The radius must be as small as possible, while still meeting the criteria.

Content preview

ARE 5.0 - PA - Practice Test UPDATED
ACTUAL Exam Questions and CORRECT
Answers
The minimum land area for a project - CORRECT ANSWER - Found by dividing the total
number of dwelling units needed for a project by the acceptable number of dwelling units per
acre.


50'-0" - CORRECT ANSWER - A cul-de-sac must be designed so that a large motorhome can
come in and turn around. The radius must be as small as possible, while still meeting the criteria.


1 year - CORRECT ANSWER - A downtown area of a small city is located along a river.
Much of it is located in flood zone AE. The area flooded during heavy rains in 2012.
What is the soonest the next flood event can be expected after the first flood?


Motel - CORRECT ANSWER - The architect is reviewing residential group classifications.
What residential occupancy would be classified in Group R-1?


Regionalism - CORRECT ANSWER - An architect is using the geographical context of the
area as a guide for the design of the building.
What is this called?


Maintenance Cost - CORRECT ANSWER - "In the design of a new art studio the client has
requested the use of sustainable systems be incorporated throughout the project. The client is
concerned, however, that passive solar heating will not prove beneficial to the space.
Which one of the following would be an advantage of installing passive solar heating?


Electrical - CORRECT ANSWER - Which type of code is most consistent across the United
States?

, Highly visible entrances - CORRECT ANSWER - An architect is developing concepts for an
affordable housing community to house 80 dwelling units as a mix of one- and two-story
duplexes and quads.
Which of the following is a safety feature that can be incorporated at the exterior of the buildings
to help deter crime?


Place the buildings at varying grade elevations and place low, planted berms between the
buildings - CORRECT ANSWER - An office park is being designed. The buildings will be
located with 60 to 100 feet between them. The buildings are approximately 3-4 stories each and
the average floor area is about 4,000 square feet each. The visual and acoustical impact of each
building as experienced from adjacent buildings shall be reduced and the buildings should be
designed to provide the perception of distance between them.
Which of the following site design elements should be implemented?


South side is exposed - CORRECT ANSWER - Under what circumstances would the south
side of a structure be exposed, and when would the sides be flat?
Which of the following is true of an earth-sheltered structure?


Inclusion of at least one anchor store such as a grocery or department store - CORRECT
ANSWER - Current best practices for planning a shopping mall includes which of the
following?


check the swing of the existing door. The existing door will need to swing in the direction of
egress travel (outward) because the occupancy load is 50 or more persons. - CORRECT
ANSWER - An existing room occupancy load is changing.
A large room in an existing building is being renovated into an open office space. Existing
interior partitions are being demoed to accommodate the open office layout. The occupancy load
of the large room will increase from 30 people to 50 people, based on the occupancy load table in
IBC. Currently, there is only one means of access and egress for the room. What, if anything,
does the architect need to do about the existing door swing to ensure that it meets code?


Southeast orientation - CORRECT ANSWER - Several orientations are being considered for
the main façade of a new office building at 40° latitude north.

Document information

Uploaded on
January 30, 2025
Number of pages
10
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$10.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
MGRADES
4.0
(235)
Sold
1538
Followers
108
Items
110360
Last sold
1 day ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions