The Owner can specify in the contract how and what subcontractors can be
sourced for the project. (T/F) Ans✓✓-True


Select the best definition for General Contractor.
A. The Company that tells everyone on the project how and when to perform B.
The company or individual responsible for overseeing the construction process
and managing any subcontractors, if applicable
C. The Company that performs the Front-End Loading and Engineering design
Ans✓✓-The company or individual responsible for overseeing the construction
process and managing any subcontractors, if applicable


What are examples of contract documents?
A. Blueprints
B. Scope of Work
C. Design drawings
D. All of these answers
E. Technical specifications Ans✓✓-All of these answers


What is a Guaranteed Maximum Price contract?
A. The maximum amount the owner will have to pay the contractor is capped and
is not to exceed
B. The maximum price the owner is to pay the vendors for materials and
equipment
C. The maximum price the owner is to pay the subcontractor Ans✓✓-The
maximum amount the owner will have to pay the contractor is capped and is not
to exceed

,What is a Design Bid contract?
A. A contract method that addresses design and construction costs
simultaneously
B. A contract method that uses fast-tracking incentives as the basis of the contract
C. A contract method that bids after design Ans✓✓-A contract method that
addresses design and construction costs simultaneously


A strong construction contract will outline the project's scope and leave little to
no room for which of the following.
A. Confusion on either side
B. Additional addendums
C. Red-line drawings Ans✓✓-Confusion on either side


Select the best definition for change request.
A. Describes how any requested changes will be communicated to the general
contractor, as well as any fees required for change orders and timelines for when
changes can be requested and handled
B. A request for better working conditions and pay
C. A request for additional work Ans✓✓-Describes how any requested changes
will be communicated to the general contractor, as well as any fees required for
change orders and timelines for when changes can be requested and handled


The right to subcontract any project work has to be outlined by which of the
following. Select all that apply.
A. The Prime Contractor
B. The contract

,C. The Owner Ans✓✓-The contract


What is a Time and Materials contract?
A. The maximum price the owner is to pay the subcontractor
B. The maximum price the owner is to pay the vendors for materials and
equipment
C. A contract that requires the client to pay the contractor for all labor and
materials at a pre-negotiated rate Ans✓✓-A contract that requires the client to
pay the contractor for all labor and materials at a pre-negotiated rate


Of the three contracts LS, LSTK, and GMP, which once affords the most protection
financially and allows the owner to secure investors and loans?
A. GMP
B. All of these answers
C. LSTK
D. LS Ans✓✓-GMP


What are examples of construction contract clauses for escalation?
A. Fuel and gas
B. Steel
C. Construction materials and equipment
D. All of these answers Ans✓✓-All of these answers


What does Indemnification mean?
A. Holds the owner responsible for any injuries after the project is over

, B. The responsibility of the contractor for any damages or loss incurred by the
owner due to the work of the contractor
C. Legal term to hold the owner responsible for Prime Contractor negligence
Ans✓✓-The responsibility of the contractor for any damages or loss incurred by
the owner due to the work of the contractor


Select the best definition for labor and materials.
A. Specific to only construction and small business contracts
B. Only used in State and not Federal Contracting language
C. A contractor who is responsible for procuring the materials, as well as any costs
associated with the labor and materials needed to complete the work Ans✓✓-A
contractor who is responsible for procuring the materials, as well as any costs
associated with the labor and materials needed to complete the work


The advantage of cost plus is that the Prime Contractor will incur a profit. (T/F)
Ans✓✓-True


Timeline is defined by which of the following.
A. Finish Date
B. Start Date
C. Both Ans✓✓-Both


What is a Design Bid Build contract?
A. All of these answers
B. The process that saves the owner time and money by combining the design and
construction

Document information

Uploaded on
January 29, 2025
Number of pages
31
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$16.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
cracker
3.8
(401)
Sold
2172
Followers
1346
Items
50102
Last sold
7 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions