Answers 100% Pass
Existing Veg, Desc/Purp - ✔✔temp or perm bmp desi to stab soil and remove sups
part from sheet flow runoff.
Existing Veg, Objectives - ✔✔1) Site Plan and Mang
2) Erosi Cont
3) Sedi Cont
4) Post-Cons Mang
Existing Veg, applic - ✔✔1) Areas within site where no const activity is occur
2) Areas where local, state and fed govt require preservation
3) Areas where existing veg can be utilized for eros, sedi, and storm water quality.
Existing veg: inspection - ✔✔1) Accord to regu timetables
2) erosi and damage veg
3) sufficient moisture to ensure growth
4) veg is well stab
Katelyn Whitman, All Rights Reserved © 2025 1
,5) adequate cover
6) debris and litter
7) invasive exotics
Existing veg: maint - ✔✔1) only disturb area for construct
2)irrigate dry seasons
3) remove see, and replant if need be
4) replant or rework buffer strips
5) mow and cut perennial weeds
6) remove all trash and debri
7) treat invasive and noxious species
Sched/Sequ, purp/descrip - ✔✔Temp, procedural control that involves creating a
written plan to address neck bmps and sequencing of construct activities to mitigate the
erosive effects of wind,water and construct activities.
Sched/Sequ: object - ✔✔1) site planning & management
2) erosion control
3) sediment control
Katelyn Whitman, All Rights Reserved © 2025 2
,Sched/Sequ: applications - ✔✔1) develop timetables for certain activities, paretic
during rainy season
Sched/Sequ: inspect - ✔✔1) inclusion of sched/seq as a bmp in the plan
2) ached site activities mirroring ached activites.
Sched/Sequ: maintanence - ✔✔1) modify ached of active when changes are warranted
2) modify ached of active prior to rainy season to reflect updated bmp info
Hydroseed: Des& purp - ✔✔Temp or perm bmp designed to reduce erosion and runoff
by applying mix of seed, fert and stabilizing emulsion.
Hydroseed: object - ✔✔1) erosion control
2) good housekeeping/ materials management
3) post construct management
Hydroseed: targeted pollut - ✔✔1) sediment
2) nutrients
3) metals
4) ph
Hydroseed: imp consid - ✔✔1) need adequate moisture
2) additional mulch may be added
Katelyn Whitman, All Rights Reserved © 2025 3
, 3) pretreatment where cover is not met
4) apply from multi angles to avoid shadowing
Hydroseed: limitations - ✔✔1) seed mix approp for seasonal conditions
2) time of application per seasonal conditions
3) difficult on steep slopes
4) no pedestrian or vehicle traffic
5) avoid high winds
Hydroseed: inspect: - ✔✔1) adequate coverage of diet areas
2) signs of pedest or vehicle traffic
3) signs of animal activity
4) check seed mix for correct type and application rate
Hydroseed: Maint - ✔✔1) reapply in areas needing more cover
2) insure proper moisture
3) maintain unbroken coverage through out project
4) require repair due to traffic or animals
Hydroseed: potentailly assoc bmps - ✔✔1) hydromulch
Katelyn Whitman, All Rights Reserved © 2025 4