• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 30 pages
Exam (elaborations)

PJM cert: TO final Correct 100%

Document preview thumbnail
Preview 3 out of 30 pages

Which of the following would not be an action to take for low voltages A. Increase generator MW output B. Remove reactors from the system C. Increase generator MVAR output D. Place capacitors in service - ANSWER A. Increase generator MW output PJM operates it's 500 KV system so that no post contingency voltage drop will exceed what minimum value A. 1% B. 3% C. 5% D. 7% - ANSWER C. 5%

Content preview

PJM cert: TO final Correct 100%
Which of the following would not be an action to take for low voltages
A. Increase generator MW output
B. Remove reactors from the system
C. Increase generator MVAR output
D. Place capacitors in service - ANSWER A. Increase generator MW output

PJM operates it's 500 KV system so that no post contingency voltage drop will exceed
what minimum value
A. 1%
B. 3%
C. 5%
D. 7% - ANSWER C. 5%

The PJM system operator finds that a 230 KV transmission line is over its normal limit.
How long does the operator have to return the line to within its normal limit
A. Immediately
B. 5 minutes
C. 15 minutes
D. 30 minutes - ANSWER C. 15 minutes

What action can an operator take to increase its system dynamic reactive reserve
A. Increase a generator MW output
B. Remove a capacitor from service
C. Place a capacitor in service
D. Take a generator off-line - ANSWER C. Place a capacitor in service

The first step that an operator should take following a system separation should be
A. Clear all buses
B. Assess the system
C. Place all QuickStart units in service
D. Notify NERC - ANSWER B. Assess the system

PJM transmission owners are required to provide PJM with four sets of thermal limits for
all facilities monitored by PJM. Which of the following is not one of the four
A. Actual
B. Normal
C. Emergency
D. Load dump - ANSWER A. Actual

If a transmission facility is found to be loaded above it's short term emergency limit, how
long does the operator have to correct the problem
A. 5 minutes
B. 10 minutes

,C. 15 minutes
D. 30 minutes - ANSWER C. 15 minutes

If a shunt reactor is placed in service the expected result would be
A. An increase in voltage
B. A decrease in voltage
C. An increase in synchronous reserves
D. A decrease in synchronous reserves - ANSWER B. A decrease in voltage

What would be the expected results from the tripping of 1000 MW generator outside of
the PJM RTO, but within the eastern interconnection
A. Frequency would drop, but the PJM ACE would remain unchanged
B. Frequency would drop and the PJM ACE would also indicate under generation
C. Frequency and PJM ACE would remain the same
D. Frequency would drop and the PJM ACE would indicate 1000 MW under generation
- ANSWER A. Frequency would drop, but the PJM ACE would remain unchanged

When a discrepancy occurs between PJMs thermal rating and a transmission owners
thermal rating which of the following is always used
A. PJM's rating
B. Transmission owners rating
C. The most conservative rating
D. The average of the two ratings - ANSWER C. The most conservative rating

If PJM operates to a 5% voltage drop limit on the 500 KV system which of the following
would be considered a violation
A. Pre-530 KV, post - 515 KV
B. Pre-545 KV, post - 520 KV
C. Pre-535 KV, post- 512 KV
D. Pre-536 KV, post - 507 KV - ANSWER D. Pre-536 KV, post - 507 KV

According to the PJM transmission operation manual, if a 500 KV line trips out of
service and does not re-close in the PJM Mid-Atlantic region the transmission operator
should
A. Leave it out of service and submit outage via eDART
B. Manually re-close within five minutes
C. Reclose after 30 minutes
D. Restart EMS - ANSWER B. Manually re-close within five minutes

The PJM system has phase angle regulators between the New York ISO and PJM
systems. The phase angle regulators are there to help?
A. Maintain system VAR flow
B. Increase overall system voltages
C. Control MW flows
D. Reduce overall market price - ANSWER C. Control MW flows

, When would PJM issue a low voltage alert
A. When loads are heavy and bulk power voltage levels are expected to be low
B. When Virginia power and NY- ISO is experiencing high loads
C. When a PJM member system is experiencing a new system peak load
D. When PJM has projected that they will experience problems in meeting their CPS
criteria - ANSWER A. When loads are heavy and bulk power voltage levels are
expected to be low

PJM operates with different temperature adjusted ratings during the day and night
periods. If the weather forecast indicates that the day period Temperature will be 48°
what temperature setting should be utilized
A. 41° day
B. 41° night
C. 50° day
D. 50° night - ANSWER C. 50° day

Which temperature range makes up the PJM ambient temperature sets
A. 10° to 95°F
B. 10° to 99°F
C. 32° to 105°F
D. 32° to 95°F - ANSWER D. 32° to 95°F

Which of the following actions would most likely result in a reduction of a generators
MVAR output
A. Placing a nearby reactor in service
B. Increase the generator MW output
C. Placing a nearby shunt capacitor in service
D. Removing a nearby capacitor from service - ANSWER C. Placing a nearby shunt
capacitor in service

If your system configuration was such that you had three parallel lines of the same
construction, length, and impedance with a normal rating of 160 MVA. Each of the lines
currently has a loading of 120 MVA on each line. If one of the three lines were to trip out
of service what would be the expected flow on the remaining two lines
A. 120
B. 160
C. 180
D. 240 - ANSWER C. 180

If your system configuration is such that you had three parallel lines of the same
construction, length, and impedance with a normal rating of 155 MVA and an
emergency rating of 170 MVA each of the lines has a loading of 130 MVA if one of the
lines were to trip out of service what limits if any would be exceeded
A. Normal and emergency
B. Normal only
C. Neither due to the surge impedance loading of the line

Document information

Uploaded on
January 22, 2025
Number of pages
30
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$19.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Lecchris
3.8
(6)
Sold
43
Followers
15
Items
3198
Last sold
3 months ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions