A person conducting UST monitoring equipment certification shall affix tag/sticker on
each component and shall include ___ and ___. - ANS Date certified, replaced or
repaired
Contractor/tank tester's license number
All monitoring equipment shall be tested, calibrated, operated, maintained, and certified
every ____ months. - ANS 12 months
Any person who intentionally tampers with LLD shall be punished with fines no less than
$______. - ANS $5000
By December 22 1998, all automatic line leak detectors installed on SW pressurized
piping must be capable of: - ANS Shutting down the piping system
CA law requires USTs be inspected every_____ - ANS 1 year
Cathodic protection maintenance records must be kept on file for ______ - ANS
6.5 years
Cathodic protection tester will test cathodic protection system within __ months of
installation and every __ years thereafter - ANS 6 months
3 years
Corrosion Specialist - ANS designs and certifies cathodic protection system
Date that all UDC upgrades shall be completed - ANS December 31, 2003
Date that all UST systems must have Line Leak Detector installed - ANS
November 9,2004
Date that overfill alarms were required on all UST systems - ANS December
22,1998
Designated operator must conduct inspections of UST every____ - ANS month
A person conducting UST monitoring equipment certification shall affix tag/sticker on
each component and shall include ___ and ___. - ANS Date certified, replaced or
repaired
Contractor/tank tester's license number
All monitoring equipment shall be tested, calibrated, operated, maintained, and certified
every ____ months. - ANS 12 months
Any person who intentionally tampers with LLD shall be punished with fines no less than
$______. - ANS $5000
By December 22 1998, all automatic line leak detectors installed on SW pressurized
piping must be capable of: - ANS Shutting down the piping system
CA law requires USTs be inspected every_____ - ANS 1 year
Cathodic protection maintenance records must be kept on file for ______ - ANS
6.5 years
Cathodic protection tester will test cathodic protection system within __ months of
installation and every __ years thereafter - ANS 6 months
3 years
Corrosion Specialist - ANS designs and certifies cathodic protection system
Date that all UDC upgrades shall be completed - ANS December 31, 2003
Date that all UST systems must have Line Leak Detector installed - ANS
November 9,2004
Date that overfill alarms were required on all UST systems - ANS December
22,1998
Designated operator must conduct inspections of UST every____ - ANS month