CIPS L6M5 - Strategic Programme Leadership LO1 Exam Questions And Answers (Guaranteed A+) Van Weele purchasing development model - Answer1. Transactional orientation, serve the factors - supply relationship is reactive, relationship based on provision of raw materials and components. 2. Commercial orientation, lowest unit price - relationship is based on price negotiation aimed at achieving lowest prices for the organisation. 3. Co-ordinated purchasing - procurement and supply using uniform policies, processes and systems. Often bureaucratic and slow to respond to units. 4. Internal integration cross-functional purchasing - relationship becomes more integrated. Focuses on cross functional problem solving 5. External integration: supply chain-management - Outsourcing strategies developed with supply chain partners. 6. Value chain orientation - Recognises P&S strategy needs to deliver value to the end customer, strong relationships encouraged with suppliers. ©EVERLY 2024/2025 ALL RIGHTS RESERVED. 2 | P a g e EPC Contract - AnswerAn EPC Contract is appealing to the client as a turnkey solution and a risk mitigation tool - the EPC contractor assumes all of the responsibilities and risk of completing a programme EPC Contract vs D&B - AnswerClose links between EPC and D&B contracts - the difference is that the EPC contract requires the contractor the design and construct a building to a specification where it is capable of producing a certain level of output. Mechanical completion - AnswerStart up and commissioning of all systems in a building Performance Testing - AnswerDemonstrates that the building is suitable for the requirements of a client Performance Testing - AnswerIs important in terms of the programme as it allow the contractor to avoid LDs or claim bonuses if the programme is completed early provisional acceptance - Answerthe client accepts the performance on the basis that the contractor remains responsible for finding a remedy Commercial operation - AnswerUpon acceptance, the responsibility and ownership transfers to the client and the Commercial operation of the facility may commence EPC contracts - AnswerAre: - Fixed price contracts - Have a fixed completion date ©EVERLY 2024/2025 ALL RIGHTS RESERVED. 3 | P a g e - Limited contractor claims as all risk is passed to the contractor - Limits of liability - EPC contractors seek cap EPC contracts - AnswerThe biggest risks that the client bares on an EPC contract is ensuring that the spec is correct, and communicating what is required to teh contractor Management Contractor Warranties - AnswerAlthough clients only deal with one contractor under mgmt. contracting, it may request warranties from the individual works contractors so that direct claims can be made in the event that mgmt. contactor becomes insolvent Statement of need - AnswerAfter a review of the statement of need, it may be decided that a new progrmme is not needed Workflow plan for: Management contracting and construction management - Answer- Business Justification = Statement of need and prepare preliminary BC - Feasibility Study = Allows the client to prepare a business case for the proposed option - Project Brief = the basis for the design - Concept Design = the initial idea for the facility design is proposed - Appointment of Management contractor or construction manager = tender, framework, referral, interview - Production information = the info needed for the works contractor to perform the activities is prepared - tender works contract = works or trade contracts released for tender

Meer zien Lees minder
Instelling
CIPS L6M5
Vak
CIPS L6M5










Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
CIPS L6M5
Vak
CIPS L6M5

Documentinformatie

Geüpload op
12 januari 2025
Aantal pagina's
28
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

©EVERLY 2024/2025 ALL RIGHTS RESERVED.




CIPS L6M5 - Strategic Programme
Leadership LO1 Exam Questions And
Answers (Guaranteed A+)


Van Weele purchasing development model - Answer✔1. Transactional orientation, serve the

factors - supply relationship is reactive, relationship based on provision of raw materials and

components.

2. Commercial orientation, lowest unit price - relationship is based on price negotiation aimed at

achieving lowest prices for the organisation.

3. Co-ordinated purchasing - procurement and supply using uniform policies, processes and

systems. Often bureaucratic and slow to respond to units.

4. Internal integration cross-functional purchasing - relationship becomes more integrated.

Focuses on cross functional problem solving

5. External integration: supply chain-management - Outsourcing strategies developed with

supply chain partners.

6. Value chain orientation - Recognises P&S strategy needs to deliver value to the end customer,

strong relationships encouraged with suppliers.




1|Page

, ©EVERLY 2024/2025 ALL RIGHTS RESERVED.

EPC Contract - Answer✔An EPC Contract is appealing to the client as a turnkey solution and a

risk mitigation tool - the EPC contractor assumes all of the responsibilities and risk of

completing a programme


EPC Contract vs D&B - Answer✔Close links between EPC and D&B contracts - the difference

is that the EPC contract requires the contractor the design and construct a building to a

specification where it is capable of producing a certain level of output.


Mechanical completion - Answer✔Start up and commissioning of all systems in a building


Performance Testing - Answer✔Demonstrates that the building is suitable for the requirements

of a client


Performance Testing - Answer✔Is important in terms of the programme as it allow the

contractor to avoid LDs or claim bonuses if the programme is completed early


provisional acceptance - Answer✔the client accepts the performance on the basis that the

contractor remains responsible for finding a remedy


Commercial operation - Answer✔Upon acceptance, the responsibility and ownership transfers to

the client and the Commercial operation of the facility may commence


EPC contracts - Answer✔Are:




- Fixed price contracts

- Have a fixed completion date


2|Page

, ©EVERLY 2024/2025 ALL RIGHTS RESERVED.

- Limited contractor claims as all risk is passed to the contractor

- Limits of liability - EPC contractors seek cap


EPC contracts - Answer✔The biggest risks that the client bares on an EPC contract is ensuring

that the spec is correct, and communicating what is required to teh contractor


Management Contractor Warranties - Answer✔Although clients only deal with one contractor

under mgmt. contracting, it may request warranties from the individual works contractors so that

direct claims can be made in the event that mgmt. contactor becomes insolvent


Statement of need - Answer✔After a review of the statement of need, it may be decided that a

new progrmme is not needed


Workflow plan for: Management contracting and construction management - Answer✔-

Business Justification = Statement of need and prepare preliminary BC

- Feasibility Study = Allows the client to prepare a business case for the proposed option

- Project Brief = the basis for the design

- Concept Design = the initial idea for the facility design is proposed

- Appointment of Management contractor or construction manager = tender, framework, referral,

interview

- Production information = the info needed for the works contractor to perform the activities is

prepared

- tender works contract = works or trade contracts released for tender



3|Page

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Everly Teachme2-tutor
Bekijk profiel
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
19
Lid sinds
1 jaar
Aantal volgers
1
Documenten
2795
Laatst verkocht
1 dag geleden
Study packs.

Find Quality Exam Materials made by professionals With A guaranteed A+

4.3

4 beoordelingen

5
2
4
1
3
1
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen