Con 367 Exam 1 With
Complete Solution
Professional CM (Agency CM) - ANSWER Which one of the following is not a
Project Delivery System?
In lump-sum contracts, the Owner assumes the risk of cost. - ANSWER False
Typically, the Design Reviewer has the ultimate responsibility and authority
to make executive decisions related to matters affecting time and money in a
construction project. - ANSWER False
In the Design-Build project delivery system, the Owner has separate contracts
with the Designer and the Contractor. - ANSWER False
The Resident Project Representative should stop the work of the Contractor
when the work is not performed according to the drawings and
specifications. - ANSWER False
Which of the following should not be performed by the Resident Project
Representative for inspections? - ANSWER Providing instructions directly to
subcontractors
Which of the following is not true for the construction diary? - ANSWER
Entries should be made on a weekly basis (i.e., at the end of each week)
Ambiguous language in a contract is interpreted against the party who
selected the language or supplied the contract. - ANSWER True
, According to Spearin Doctrine, when the contractor exactly follows the detail
specifications and drawings, she/he will not be responsible for unsatisfactory
results in the end product. - ANSWER True
Shop drawings can be used as change orders. - ANSWER False
Which one of the following is not an element of the Contract as we discussed
in class? - ANSWER (Promise)
Offer
Acceptance
Consideration
Which of the following is not a condition where a contract will not be
enforced by courts? - ANSWER Seniority
Fill in the blank in the following statement: Some contracts must be in
writing under the ____________ as adopted by each state. - ANSWER Statute of
Frauds
RFI (Request for Information) is the document that is transmitted to the
General Contractor from the Designer to get clarifications with respect to
design drawings and specifications. - ANSWER False
The resident project representative should not supervise, direct, or control
the contractor's means and methods of performing work. - ANSWER True
In fast-track projects with multiple contractors, the services of a professional
construction management firm (Agency CM) are essential. - ANSWER True
A professional construction management firm (Agency CM) can participate in
the following phases of a project: - ANSWER Conception, Program Planning,
Complete Solution
Professional CM (Agency CM) - ANSWER Which one of the following is not a
Project Delivery System?
In lump-sum contracts, the Owner assumes the risk of cost. - ANSWER False
Typically, the Design Reviewer has the ultimate responsibility and authority
to make executive decisions related to matters affecting time and money in a
construction project. - ANSWER False
In the Design-Build project delivery system, the Owner has separate contracts
with the Designer and the Contractor. - ANSWER False
The Resident Project Representative should stop the work of the Contractor
when the work is not performed according to the drawings and
specifications. - ANSWER False
Which of the following should not be performed by the Resident Project
Representative for inspections? - ANSWER Providing instructions directly to
subcontractors
Which of the following is not true for the construction diary? - ANSWER
Entries should be made on a weekly basis (i.e., at the end of each week)
Ambiguous language in a contract is interpreted against the party who
selected the language or supplied the contract. - ANSWER True
, According to Spearin Doctrine, when the contractor exactly follows the detail
specifications and drawings, she/he will not be responsible for unsatisfactory
results in the end product. - ANSWER True
Shop drawings can be used as change orders. - ANSWER False
Which one of the following is not an element of the Contract as we discussed
in class? - ANSWER (Promise)
Offer
Acceptance
Consideration
Which of the following is not a condition where a contract will not be
enforced by courts? - ANSWER Seniority
Fill in the blank in the following statement: Some contracts must be in
writing under the ____________ as adopted by each state. - ANSWER Statute of
Frauds
RFI (Request for Information) is the document that is transmitted to the
General Contractor from the Designer to get clarifications with respect to
design drawings and specifications. - ANSWER False
The resident project representative should not supervise, direct, or control
the contractor's means and methods of performing work. - ANSWER True
In fast-track projects with multiple contractors, the services of a professional
construction management firm (Agency CM) are essential. - ANSWER True
A professional construction management firm (Agency CM) can participate in
the following phases of a project: - ANSWER Conception, Program Planning,