Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 28 pages
Exam (elaborations)

ACI WRITTEN EXAM QUESTIONS | TESTED AND PROVEN ANSWERS | LATEST UPDATE 2024/2025 100% (GRADE A+)

Document preview thumbnail
Preview 3 out of 28 pages

ACI WRITTEN EXAM QUESTIONS | TESTED AND PROVEN ANSWERS | LATEST UPDATE 2024/2025 100% (GRADE A+)ACI WRITTEN EXAM QUESTIONS | TESTED AND PROVEN ANSWERS | LATEST UPDATE 2024/2025 100% (GRADE A+)

Content preview

ACI WRITTEN EXAM QUESTIONS | TESTED AND
PROVEN ANSWERS | LATEST UPDATE 2024/2025
100% (GRADE A+)
The sensor of the temperature measureing device shall be submerged a minimum of ____ in


Ans>> 3 (75mm)




The temperature measureing device shall have a capacity of measuring temperature of

freshly mixed conrcrete to +-_____ degrees F throught a range of _____


Ans>> 1(.5 degrees C), 30-120 (0-50 degrees C)




The temperature measuring device shall be calibrated____, or whenever there is a question

of _____


Ans>> annually, accuracy




The temp of concrete may be measured in a wheelbarrow


Ans>> true




the temp of concrete may be measured in a wall form



1

,Ans>> true




A composite sample of concrete is required even if the only purpose for obtaining the

sample is to determine temp.


Ans>> false




What must be done to the sample container prior to sampling the concrete


Ans>> dampen (with water)




what must be done to the concrete surrounding the temp measuring device after the device

has submerged


Ans>> Press concrete around measuring device




How long must the temp device remain in the concrete


Ans>> at least 2 minutes (but no more than 5)




After temp of concrete is read, what then is required



2

, Ans>> reporting of temp




the temp of concrete to be measured to the nearest ____degree F


Ans>> 1 (.5 degree C)




According to the ASTM C1064 what is one reason to take the temp of concrete


Ans>> verify conformance to a specified requirement for temp




A max temp of concrete is specified in ASTM C1064


Ans>> False




The sample of concrete used for temp determination must be rodded 25 times


Ans>> False




Sampling by this method is required when tests are to be made to determine ____ with

specification requirements


Ans>> compliance


3

Document information

Uploaded on
January 6, 2025
Number of pages
28
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$13.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
0
Followers
0
Items
343
Last sold
-



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions