• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 17 pages
Exam (elaborations)

ACI Concrete Field-Testing Technician- Grade I with Verified Answers

Document preview thumbnail
Preview 3 out of 17 pages

ACI Concrete Field-Testing Technician- Grade I with Verified Answers 1. The sensor of the temperature mea- suring device shall be submerged a minimum of in. [ mm] into the freshly mixed concrete. 2. The temperature measuring device shall have a capacity of measuring temperature of freshly mixed con- crete to +- degrees F [+- C] throughout a range of . 3. The temperature measuring device shall be calibrated , or whenev- er there is a question of . 3 in. [75 mm] 1 degree F [0.5 C], 30 degrees F to 12

Content preview

ACI Concrete Field-Testing Technician- Grade I with Verified Answers

1. The sensor of the temperature mea- 3 in. [75 mm]
suring device shall be submerged
a minimum of in. [ mm]
into the freshly mixed concrete.

2. The temperature measuring device 1 degree F [0.5 C], 30 degrees F to
shall have a capacity of measuring 120 F [0 C to 50 C]
temperature of freshly mixed con-
crete to +- degrees F [+-
C] throughout a range of .

3. The temperature measuring device Annually, accuracy
shall be calibrated , or whenev-
er there is a question of .

4. The temperature of concrete may be True
measured in a wheelbarrow. True or
False?

5. The temperature of concrete may True
be measured in a wall form. True of
False

6. A composite sample of concrete is False
required even if the only purpose for
obtaining the sample is to determine
temperature. True of False?

7. What must be done to the sample Dampen (with water)
container prior to sampling the con-
crete?

8. What must be done to the concrete Gently press the concrete around
surrounding the temperature mea- the temperature measuring device
suring device after the device is sub- at the surface of the concrete
merged in the fresh concrete.

9. How long must the temperature mea- At least 2 minutes but not more than
suring device remain in the freshly 5 minutes
mixed concrete?


,ACI Concrete Field-Testing Technician- Grade I with Verified Answers


10. After the temperature of the concrete Reporting of temperature
is read, what is required?

11. The temperature of concrete is re- 1 degree F [0.5 C]
ported to the nearest degrees
F[ C]

12. According to ASTM C1064, what is Verify conformance to a specified
one reason to take the temperature requirement for temperature of con-
of concrete? crete

13. A maximum temperature of freshly False
mixed concrete is specified in ASTM
C1064. True of False?

14. The sample of concrete used for tem- False
perature determination must be rod-
ded 25 times. True or False?

15. Sampling by this method is required Compliance
when tests are to be made to de-
termine with specification re-
quirements.

16. This method covers sampling from Stationary mixers, paving mixers, re-
four types of mixtures which are volving drum mixers, and open top
, , , and . mixers

17. The maximum allowable time be- 15
tween obtaining the first and final
portions of a composite sample is
minutes.

18. Portions of a composite sample shall True
be thoroughly remixed bfore begin-
ning tests on the sample. True of
False?

19. 5


, The maximum elapsed time allowed
between obtaining the final portion
of the composite sample and begin-
ning the tests for slump, tempera-
ture, and air content is min-
utes.

20. The molding of strength test speci- 15
mens shall begin within min-
utes after fabricating the composite
sample.

21. The concrete sample must be Rapid evaporation
protected from contamination and
.

22. The minimum size sample for mak- 28 L (1ft^3)
ing strength test specimens is
.

23. When sampling from a stationary 2
mixer, the batch must be sampled at
or more regularly spaced in-
tervals during discharge of the mid-
dle portion of the batch

24. The composite sample for a paving 5
mixer must represent a minimum of
different portions of the batch
of concrete taken from the pile after
discharge.

25. When sampling from a revolving 2
drum truck mixer, concrete must be
sampled at a minimum of reg-
ularly spaced intervals during dis-
charge of the middle portion of this
batch.

26. False

Document information

Uploaded on
January 6, 2025
Number of pages
17
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$14.09

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
MERCYTRISHIA
3.9
(43)
Sold
248
Followers
35
Items
15153
Last sold
3 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions