with guaranteed pass
The Agile Release Train passes through four steps in order to deliver Solutions which includes:
defining new functionality, implementing, acceptance testing, and what else?
1 Completing phase-gate steps
2 Deploying
3 Regulatory compliance
4 DevOps testing - ANS ☑ *Deploying*
If small batches go through the system faster with lower variability, then which two statements
are true about batch size? (Choose two.)
1 Good infrastructure enables large batches
2 Proximity (co-location) enables small batch size
3 Batch sizes cannot influence our behavior
4 Severe project slippage is the most likely result of large batches
5 Low utilization increases variability - ANS ☑ *Proximity (co-location) enables small batch
size*.
☑ *Severe project slippage is the most likely result of large batches*.
Which statement is true about batch size?
1 Large batch sizes limit the ability to preserve options
2 When stories are broken into tasks it means there are small batch sizes
3 Large batch sizes ensure time for built-in quality
4 When there is flow it means there are small batch sizes - ANS ☑ *Large batch sizes limit the
ability to preserve options*
, Weighted Shortest Job First gives preference to jobs with which two characteristics? (Choose
two.)
1 Higher Cost of Delay
2 Lower Cost of Delay
3 Fixed date
4 Shorter duration
5 Revenue impact - ANS ☑ *Higher Cost of Delay*.
☑ *Shorter duration*.
Implementing SAFe requires buy-in from all levels of the organization. What level of leadership
is most important for effecting cultural change?
1 Release Train Engineers
2 Solution Management
3 Product Owners
4 Executive Management - ANS ☑ *Executive Management*.
Which two statements describe a Capability? (Choose two.)
☒ It is maintained in the Portfolio Backlog
☑ It must be structured to fit within a single PI
☑ It is written using a phrase, benefit hypothesis, and acceptance criteria
☒ It remains complete and becomes a Feature for implementation
☒ It is developed and approved without a dependence on the Solution Kanban - ANS 1 ☑ *It
must be structured to fit within a single PI*.
2 ☑ *It is written using a phrase, benefit hypothesis, and acceptance criteria*.
Lifelong learning is a requirement for Lean-Agile Leaders, and it helps them do what?
1 Provide the personnel, resources, direction, and support to the Enterprise
2 Act as an effective enabler for teams
,3 Demonstrate the values they want the teams to embody
4 Commit to quality and productivity - ANS ☑ *Demonstrate the values they want the teams to
embody*.
What does the Program Roadmap do in the Scaled Agile Framework?
1 It provides visibility into the Portfolio Epics being implemented in the next year.
2 It describes technical dependencies between Features.
3 It communicates the delivery of Features over a near term timeline.
4 It describes the program commitment for the current and next two Program Increments. - ANS
☑ *It describes the program commitment for the current and next two Program Increments*.
*Which statement describes the connection between Features and Capabilities in a large
Solution*?
1 Some Features may not have parent Capabilities.
2 There cannot be more than 5 Features for each.
3 Some Capabilities may not have child Features.
4 Every Feature has a parent Capability. - ANS ☑ *Every Feature has a parent Capability*.
*When is a Pre-PI Planning event needed*?
1 When there is only one day to run PI Planning, so more time is needed to prepare to run it
effectively.
2 When Product Owners and Scrum Masters need to coordinate dependencies within the Agile
Release Train.
3 When multiple Agile Release Trains working on the same Solution need to align and
coordinate.
4 When teams cannot identify and estimate Stories in PI Planning and need more time to prepare.
- ANS ☑ *When multiple Agile Release Trains working on the same Solution need to align and
coordinate*.
During PI Planning, which two tasks are part of the Scrum Master's role in the first team
breakout? (Choose two.)
, 1 Review and Reprioritize the team backlog as part of the preparatory work for the second team
breakout.
2 Facilitate the coordination with other teams for dependencies.
3 Provide clarifications necessary to assist the team with their story estimating and sequencing.
4 Identify as many risks and dependencies as possible for the management review.
5 Be involved in the program backlog refinement and preparation. - ANS 1 ☑ *Facilitate the
coordination with other teams for dependencies*.
2 ☑ *Identify as many risks and dependencies as possible for the management review*.
During the PI Planning event, when are planning adjustments agreed upon?
1 During the draft plan review
2 During breakout sessions
3 During the management review and problem-solving
4 During Scrum of scrums - ANS ☑ *During the management review and problem-solving*.
Why is a confidence vote held at the end of PI Planning?
1 To remove the risks for the PI
2 To build share commitment to the Program plan
3 To ensure that Business Owners accept the plan
4 To hold the team accountable if the Agile Release Train does not deliver on its commitment -
ANS ☑ *To build share commitment to the Program plan*
Which statement correctly describes one aspect of the team's commitment at the end of PI
Planning?
1 A team commits only to the PI Objectives with the highest business value.
2 A team does not commit to uncommitted objectives.
3 A team commits to all the Features they put on the program board.
4 A team commits to all the Stories they put on their PI plan. - ANS ☑ *A team does not commit
to uncommitted objectives*