100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

Walmart - Stormwater Exam Questions and Answers 100% Solved | Graded A+

Rating
-
Sold
-
Pages
4
Grade
A+
Uploaded on
02-01-2025
Written in
2024/2025

Walmart - Stormwater Exam Questions and Answers 100% Solved | Graded A+ The 1970's law that set into place the regulation of stormwater is: - The Clean Water Act Requirements for managing stormwater activity on a construction site are outlined in the following regulation: - NPDES Which of the following is never an allowable stormwater discharge from a construction site? - Discharge from contaminated groundwater The Notice of termination can filed when: - All construction activity, inside and outside the building, is complete and permanent stabilization verified Relative to stormwater permitting, all of the following must occur before construction starts except: - Submit the notice of termination (NOT) Which erosion control best mgmt practice increases water infiltration, dissipates rainfall energy and slows overland flow of stormwater - Vegetatio

Show more Read less
Institution
Walmart Management
Course
Walmart management








Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Walmart management
Course
Walmart management

Document information

Uploaded on
January 2, 2025
Number of pages
4
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Content preview

Walmart - Stormwater Exam Questions

and Answers 100% Solved | Graded A+


The 1970's law that set into place the regulation of stormwater is: - ✔✔The

Clean Water Act

Requirements for managing stormwater activity on a construction site are

outlined in the following regulation: - ✔✔NPDES

Which of the following is never an allowable stormwater discharge from a

construction site? - ✔✔Discharge from contaminated groundwater

The Notice of termination can filed when: - ✔✔All construction activity,

inside and outside the building, is complete and permanent stabilization

verified

Relative to stormwater permitting, all of the following must occur before

construction starts except: - ✔✔Submit the notice of termination (NOT)

Which erosion control best mgmt practice increases water infiltration,

dissipates rainfall energy and slows overland flow of stormwater -

✔✔Vegetation



1
©NINJANERD 2025/2026. YEAR PUBLISHED 2025.

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
NinjaNerd Liberty University
View profile
Follow You need to be logged in order to follow users or courses
Sold
206
Member since
1 year
Number of followers
4
Documents
12254
Last sold
1 day ago
NinjaNerd

Here You will All Documents and Package Deals Offered by Seller NinjaNerd.

3.8

31 reviews

5
14
4
5
3
7
2
2
1
3

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can immediately select a different document that better matches what you need.

Pay how you prefer, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card or EFT and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions