100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

2025 ACI CERTIFICATION- CONCRETE FIELD TESTING TECHNICIAN GRADE 1 CP-1 (12) QUESTIONS AND ANSWERS COMPLETE EXAM GUIDE 2025

Puntuación
-
Vendido
-
Páginas
20
Grado
A+
Subido en
31-12-2024
Escrito en
2024/2025

2025 ACI CERTIFICATION- CONCRETE FIELD TESTING TECHNICIAN GRADE 1 CP-1 (12) QUESTIONS AND ANSWERS COMPLETE EXAM GUIDE 2025

Institución
ACI CERTIFICATION- CONCRETE FIELD TESTING TECH
Grado
ACI CERTIFICATION- CONCRETE FIELD TESTING TECH










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
ACI CERTIFICATION- CONCRETE FIELD TESTING TECH
Grado
ACI CERTIFICATION- CONCRETE FIELD TESTING TECH

Información del documento

Subido en
31 de diciembre de 2024
Número de páginas
20
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

  • aci certification

Vista previa del contenido

2025 ACI CERTIFICATION- CONCRETE FIELD TESTING
TECHNICIAN GRADE 1 CP-1 (12) QUESTIONS AND
ANSWERS COMPLETE EXAM GUIDE 2025

ASTM C1064 - RIGHT ANSWER✔✔ Standard Test Method For Temperature of Freshly Mixed
Hydraulic- Cement Concrete



The sensor of the temperature measuring device shall be submerged a minimum of
inches into the freshly mixed concrete. - RIGHT ANSWER✔✔ 3"



The temperature measuring device shall have a capacity of measuring temperature of
freshly mixed concrete to ±_°F throughout a range of . - RIGHT ANSWER✔✔ 1
degree, 30
degrees to 120 degrees



The temperature measuring device shall be calibrated , or whenever there is a
question of-------------answer Annually, accuracy



The temperature of concrete may be measured in a wheelbarrow. True or False? - RIGHT
ANSWER✔✔ True



The temperature of concrete may be measured in a wall form. True or False? - RIGHT
ANSWER✔✔ True



What must be done to the sample container prior to sampling the concrete? - RIGHT
ANSWER✔✔ Dampen with water

,What must be done to the concrete surrounding the temperature measuring device after
the device is submerged in the fresh concrete? - RIGHT ANSWER✔✔ Close off air voids by
gently pressing the concrete around the device



How long must the temperature measuring device remain in the freshly mixed concrete? -
RIGHT ANSWER✔✔ minimum of two minutes, maximum of five minutes



The temperature of the concrete is reported to the nearest °F - RIGHT ANSWER✔✔ 1
degree



A maximum temperature of freshly mixed concrete is specified in ASTM C1064. True or False?
- RIGHT ANSWER✔✔ False



ASTM C172 - RIGHT ANSWER✔✔ Standard Practice for Sampling Freshly Mixed Concrete



Sampling by this method is required when tests are to be made to determine with
specification requirements. - RIGHT ANSWER✔✔ Compliance



This method covers sampling from four types of mixers, which are , , , and
. - RIGHT ANSWER✔✔ Stationary mixers, paving mixers, revolving drum mixers
and open top mixers



The maximum allowable time between obtaining the first and final portions of a composite
sample is______minutes. - RIGHT ANSWER✔✔ 15



Portions of a composite sample shall be thoroughly remixed before beginning tests on the
sample. True or False? - RIGHT ANSWER✔✔ True

, The maximum elapsed time allowed between obtaining the final portion of the composite
sample and beginning the tests for slump, temperature, and air content is minutes. -
RIGHT ANSWER✔✔ 5



The molding of strength test specimens shall begin within minutes after fabricating the
composite

sample. - RIGHT ANSWER✔✔ 15



The concrete sample must be protected from contamination and . - RIGHT
ANSWER✔✔ Rapid evaporation



The minimum size sample for making strength test specimens is . - RIGHT ANSWER✔✔
1 cubic foot



When sampling from a stationary mixer, the batch must be sampled at or more
regularly spaced intervals during discharge of the middle portion of the batch. - RIGHT
ANSWER✔✔ 2



The composite sample for a paving mixer must represent a minimum of different
portions of the batch of concrete taken from the pile after discharge. - RIGHT
ANSWER✔✔ 5



When sampling from a revolving drum truck mixer, concrete must be sampled at a
minimum of regularly spaced intervals during discharge of the middle portion of the batch.
- RIGHT ANSWER✔✔ 2



Concrete samples from a truck mixer must be obtained before any water or admixtures are
added to the mixer at the job site. True or False? - RIGHT ANSWER✔✔ False



The composite sample from a truck mixer must be obtained from the portion of the
batch. - RIGHT ANSWER✔✔ middle
$13.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor
Seller avatar
NursingExamsGuide
4.0
(1)

Conoce al vendedor

Seller avatar
NursingExamsGuide Boston College
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
2
Miembro desde
1 año
Número de seguidores
0
Documentos
35
Última venta
1 semana hace

4.0

1 reseñas

5
0
4
1
3
0
2
0
1
0

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes