What is programming? - ✔✔✔ Correct Answer > This is the process
undertaken before design during which all pertinent information about
a project is collected and analyzed
What is marble? - ✔✔✔ Correct Answer > This is a metamorphic rock
that is converted by heat and pressure from limestone into calcite
and/or dolomite
What are two places an interior designer could take a client to view
furniture directly? - ✔✔✔ Correct Answer > A designer could
accomplish this by going to a dealership or showroom
What is the maximum allowable slope for an accessible ramp? - ✔✔✔
Correct Answer > The maximum slope for this accessibility feature is 1
vertical unit for every 12 horizontal units, or 8.33%
,What is an exit access travel distance? - ✔✔✔ Correct Answer > This
is the distance an occupant must travel from the most remote point
within a building to the entrance of the nearest exit
In determining the total time required for a project, who is responsible
for estimating the construction time? - ✔✔✔ Correct Answer > The
contractor is responsible for this aspect of the total project schedule
What is high pressure decorative laminate (HPDL)? - ✔✔✔ Correct
Answer > This is a common finishing material used with millwork,
made from kraft paper overlaid with a patterned or colored sheet and a
layer of melamine resin
How does a high-intensity discharge lamp work? - ✔✔✔ Correct
Answer > This type of lamp works by passing an electric current
through a gas or vapor under high pressure
Who is responsible for making the acceptance inspection of furniture or
fixtures? - ✔✔✔ Correct Answer > The owner is responsible for this
aspect of FF&E delivery
What are six common reasons why a designer might withheld payment
to a contractor? - ✔✔✔ Correct Answer > This action might be take
because:
-the work is defective
,-the contractor failed to pay subcontractors
-the contractor has damaged the property of the owner or another
contractor
-third party claims have been filed
-evidence exists that the work will not be completed on time
-the contractor failed to conform to the contract documents
What are seven common additional services, outside the scope of
standard services, that may be provided by the interior designer? -
✔✔✔ Correct Answer > These services include:
-investigation existing conditions or facilities
-making detailed inventories of materials or furniture
-assisting with graphics or signage
-assisting with the procurement of art
-receiving and accepting furniture on behalf of the client
-making as-built drawings
-participating in selection interviews with prospective contractors
What is the minimum clear floor space required to accommodate one
stationary wheelchair? - ✔✔✔ Correct Answer > The minimum clear
floor space required for this is 30" x 48"
, What is retain age (also called holdback in Canada)? - ✔✔✔ Correct
Answer > This is a percentage (usually 10%) of each payment to a
contractor or vendor that is withheld by the owner for the purpose of
protecting the owner against incomplete or defective work
What is required from a manufacturer after it receives a purchase order
from the designer? - ✔✔✔ Correct Answer > confirmation receipt or
acknowledgement is required from the manufacturer after receiving
this from the designer
What are five ways an interior designer can charge for services? -
✔✔✔ Correct Answer > An interior designer can do this by means of:
-a fixed fee
-an hourly rate
-a percentage of the project cost
-a rate per area (square footage) planned or designer
-reselling wholesale furniture purchases at retail prices
What is the coefficient of utilization (CU)? - ✔✔✔ Correct Answer >
This value is a measure of how efficiently a luminaire distributes light
under various degrees of finish reflectivity
What are two common types of construction claims? - ✔✔✔ Correct
Answer > Two common types are:
ACTUAL EXAM COMPLETE QUESTIONS
AND VERIFIED ANSWERS GRADED A+ |
100% PASS | 2025 UPDATE!
What is programming? - ✔✔✔ Correct Answer > This is the process
undertaken before design during which all pertinent information about
a project is collected and analyzed
What is marble? - ✔✔✔ Correct Answer > This is a metamorphic rock
that is converted by heat and pressure from limestone into calcite
and/or dolomite
What are two places an interior designer could take a client to view
furniture directly? - ✔✔✔ Correct Answer > A designer could
accomplish this by going to a dealership or showroom
What is the maximum allowable slope for an accessible ramp? - ✔✔✔
Correct Answer > The maximum slope for this accessibility feature is 1
vertical unit for every 12 horizontal units, or 8.33%
,What is an exit access travel distance? - ✔✔✔ Correct Answer > This
is the distance an occupant must travel from the most remote point
within a building to the entrance of the nearest exit
In determining the total time required for a project, who is responsible
for estimating the construction time? - ✔✔✔ Correct Answer > The
contractor is responsible for this aspect of the total project schedule
What is high pressure decorative laminate (HPDL)? - ✔✔✔ Correct
Answer > This is a common finishing material used with millwork,
made from kraft paper overlaid with a patterned or colored sheet and a
layer of melamine resin
How does a high-intensity discharge lamp work? - ✔✔✔ Correct
Answer > This type of lamp works by passing an electric current
through a gas or vapor under high pressure
Who is responsible for making the acceptance inspection of furniture or
fixtures? - ✔✔✔ Correct Answer > The owner is responsible for this
aspect of FF&E delivery
What are six common reasons why a designer might withheld payment
to a contractor? - ✔✔✔ Correct Answer > This action might be take
because:
-the work is defective
,-the contractor failed to pay subcontractors
-the contractor has damaged the property of the owner or another
contractor
-third party claims have been filed
-evidence exists that the work will not be completed on time
-the contractor failed to conform to the contract documents
What are seven common additional services, outside the scope of
standard services, that may be provided by the interior designer? -
✔✔✔ Correct Answer > These services include:
-investigation existing conditions or facilities
-making detailed inventories of materials or furniture
-assisting with graphics or signage
-assisting with the procurement of art
-receiving and accepting furniture on behalf of the client
-making as-built drawings
-participating in selection interviews with prospective contractors
What is the minimum clear floor space required to accommodate one
stationary wheelchair? - ✔✔✔ Correct Answer > The minimum clear
floor space required for this is 30" x 48"
, What is retain age (also called holdback in Canada)? - ✔✔✔ Correct
Answer > This is a percentage (usually 10%) of each payment to a
contractor or vendor that is withheld by the owner for the purpose of
protecting the owner against incomplete or defective work
What is required from a manufacturer after it receives a purchase order
from the designer? - ✔✔✔ Correct Answer > confirmation receipt or
acknowledgement is required from the manufacturer after receiving
this from the designer
What are five ways an interior designer can charge for services? -
✔✔✔ Correct Answer > An interior designer can do this by means of:
-a fixed fee
-an hourly rate
-a percentage of the project cost
-a rate per area (square footage) planned or designer
-reselling wholesale furniture purchases at retail prices
What is the coefficient of utilization (CU)? - ✔✔✔ Correct Answer >
This value is a measure of how efficiently a luminaire distributes light
under various degrees of finish reflectivity
What are two common types of construction claims? - ✔✔✔ Correct
Answer > Two common types are: