Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 7 pages
Exam (elaborations)

UPC: Ch 11 Storm Drainage UPDATED ACTUAL Questions and CORRECT Answers

Document preview thumbnail
Preview 2 out of 7 pages

UPC: Ch 11 Storm Drainage UPDATED ACTUAL Questions and CORRECT Answers Storm water shall not be drained into sewers intended for ___________________. a. a combined sewer system b. sanitary drainage only c. a storm drain system d. a storm sewer system - CORRECT ANSWER - B

Content preview

UPC: Ch 11 Storm Drainage UPDATED
ACTUAL Questions and CORRECT
Answers
Storm water shall not be drained into sewers intended for ___________________.
a. a combined sewer system
b. sanitary drainage only
c. a storm drain system

d. a storm sewer system - CORRECT ANSWER -B


Subsoil drains shall be piped to a ______________________.
a. storm drain
b. street curb
c. alley

d. all of the above - CORRECT ANSWER -D


The perimeter of buildings having basements, cellars, or crawl spaces or floors below grade
shall be provided with ____________________.
a. backwater valves
b. seepage pits
c. subsoil drains

d. leech lines - CORRECT ANSWER -C


All rainwater sumps serving "public use" occupancy buildings shall be provided with
__________________.
a. single pumps
b. dual pumps
c. separate sumps

, d. overflow tanks - CORRECT ANSWER -B


Roof drains, gutters, vertical conductors or leaders, and horizontal storm drains for primary
drainage shall be sized based on ____________________.
a. 30-minute 30-year storm
b. 3 inches per hour
c. 60-minute 100-year return period

d. 6 inches per hour - CORRECT ANSWER -C


The overflow level of the secondary drain inlet above the primary drain inlet shall be not less
than ______________ inch(es) above the roof.
a. 1
b. 2
c. 6

d. 12 - CORRECT ANSWER -B


Leaders and storm drains, where connected to a combined sewer, shall be _____________.
a. trapped
b. identified
c. crown vented

d. over-sized - CORRECT ANSWER -A


Of those listed, an approved material for conductors installed above ground level in buildings
is ________________________.
a. aluminum sheet metal
b. ABS Schedule 40
c. PVC SDR 35

d. CPVC - CORRECT ANSWER -B

Document information

Uploaded on
December 26, 2024
Number of pages
7
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$10.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
MGRADES
4.0
(235)
Sold
1539
Followers
108
Items
111973
Last sold
1 day ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions