CORRECT Answers
How many hours will a Class One Brake test once your train is off air? - CORRECT
ANSWER - 24 Hours
T/F When performing a Class One Brake test, you must make sure that the brakes apply and
release on each car. - CORRECT ANSWER - True
How many working air breaks must you have when performing a Class One Brake test? -
CORRECT ANSWER - Each
Which of the following statements is true regarding a Class One Brake inspection? - CORRECT
ANSWER - Both sides of the cars are examined during the inspection process.
If you retest a care air brakes, how long does the brake have to stay applied? - CORRECT
ANSWER - Three Minutes
To what, do you arm the EOT? - CORRECT ANSWER - HTD
What is a branch pipe cut out valve use for? - CORRECT ANSWER - To cut air brakes in
and out
When the air brake system on the car or cars is/are not being supplied with air pressurized to 60
PSI or more? - CORRECT ANSWER - Off Air
Before performing an roll by inspection to verify the air brakes where released during a class one
inspection, do both sides of your train have to be inspected? - CORRECT ANSWER - Yes
, What speed must not be exceeded when doing an roll by inspection? - CORRECT
ANSWER - 10 mph
Telemetry can be use to perform air brake checks and to meet 2 way equipment requirements
when which of the following conditions prevent? - CORRECT ANSWER - 1.) The
controlling Locomotive have an HTD.
2.) The rear car is equipped with an operative EOT that is 2 way
What brake test should we perform when recouping at a high way crossing and no changes to the
consistent changed? - CORRECT ANSWER - Class Three
T/F When notified by the mechanical department that the emergency capability is
_____________ passed a _____ test no further investigating is required? - CORRECT
ANSWER - True
When you are required to pick up a cut of cars that have been off air for more than 24 hours,
which brake test must be performed? - CORRECT ANSWER - Class One
Which of the following rules are used for performing day light flashing duties? - CORRECT
ANSWER - 1.) Red Fusees
2.) Red Flags
What is not considered a failure? - CORRECT ANSWER - Rear to front
Your train is approaching a 10 mph speed restriction; at what distance prior to the restriction
must you notify the locomotive operator? - CORRECT ANSWER - No more than five no
less than 2
Your train is authorized to operate at 50, and it exceeds by 3mph; what do u do? Now 57? -
CORRECT ANSWER - Tell em to slow down; Stop and report