Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 10 pages
Exam (elaborations)

BICSI IN101, V8.0 DAY 1 EXAM QUESTIONS AND CORRECT DETAILED ANSWERS LATEST UPDATE

Document preview thumbnail
Preview 2 out of 10 pages

AHJ - ANS Abbreviation of authority having jurisdiction. The building official, electrical inspector, fire marshal, or other individuals or entities responsible for interpretation and enforcement of local building and electrical codes. (ITSIMM, page A-1 to A-2) 02_PROFESSIONALISM AND PROJECT PLANNING A drawings - ANS Architectural drawings show a plan (top) view of each floor in a building. They include all aspects of the physical construction of the buiding, which provide the detail for such items as wall types, elevations, rated construction (fire and smoke), reflected ceiling plans,door hardware schedule, exact floor penetration dimensions, cabinetry, and furnishings. If the architect employs interior designers, their work will be reflected on these drawings.(ITSIMM, page 10-5) 02_PROFESSIONALISM AND PROJECT PLANNING Code - ANS A rule or set of rules intended to ensure safety during the installation and use of materials, components, fixtures, systems, premises, and related subjects. Codes typically are invoked and enforced through government regulation. (ITSIMM, page 3-52) 02_PROFESSIONALISM AND PROJECT PLANNING E drawings - ANS Electrical drawings are very important to ICT systems cabling installers. They indicate where the electrical services are installed inside the building and the pathways that may be installed by the electrical contractor for use by the cabling installation team. The drawings indicate the grounding system installed by the electrical contractor and the location of supporting structures installed by the electrical contractor (e.g., floor boxes, cable tray, surface raceway, poke-thrus, duct banks). (ITSIMM, page 10-5) 02_PROFESSIONALISM AND PROJECT PLANNING

Content preview

K
C
LO
YC
BICSI IN101, V8.0 DAY 1 EXAM
QUESTIONS AND CORRECT
D


DETAILED ANSWERS LATEST
U



UPDATE
ST

, AHJ - ANS Abbreviation of authority having jurisdiction. The building official, electrical
inspector, fire marshal, or other individuals or entities responsible for interpretation and
enforcement of local building and electrical codes. (ITSIMM, page A-1 to A-2)
02_PROFESSIONALISM AND PROJECT PLANNING

A drawings - ANS Architectural drawings show a plan (top) view of each floor in a
building. They include all aspects of the physical construction of the buiding, which
provide the detail for such items as wall types, elevations, rated construction (fire and
smoke), reflected ceiling plans,door hardware schedule, exact floor penetration
dimensions, cabinetry, and furnishings. If the architect employs interior designers, their




K
work will be reflected on these drawings.(ITSIMM, page 10-5) 02_PROFESSIONALISM
AND PROJECT PLANNING




C
Code - ANS A rule or set of rules intended to ensure safety during the installation and
use of materials, components, fixtures, systems, premises, and related subjects. Codes




LO
typically are invoked and enforced through government regulation. (ITSIMM, page 3-52)
02_PROFESSIONALISM AND PROJECT PLANNING

E drawings - ANS Electrical drawings are very important to ICT systems cabling
installers. They indicate where the electrical services are installed inside the building
YC
and the pathways that may be installed by the electrical contractor for use by the
cabling installation team. The drawings indicate the grounding system installed by the
electrical contractor and the location of supporting structures installed by the electrical
contractor (e.g., floor boxes, cable tray, surface raceway, poke-thrus, duct banks).
(ITSIMM, page 10-5) 02_PROFESSIONALISM AND PROJECT PLANNING
D


FP drawings - ANS Fire protection drawings show the size and route of fire
U


suppression system piping and associated fire suppression agent heads and nozzles
within the structures. (ITSIMM, page 10-5) 02_PROFESSIONALISM AND PROJECT
PLANNING
ST




ICT - ANS Abbreviation of Information and Communications Technology. (ITSIMM,
page A-1) 02_PROFESSIONALISM AND PROJECT PLANNING

M drawings - ANS Mechanical drawings indicate the size and route of the HVAC
system ducts, air handler units, chilled water piping, and refrigerant piping within the
structures. (ITSIMM, page 10-5) 02_PROFESSIONALISM AND PROJECT PLANNING

Document information

Uploaded on
December 16, 2024
Number of pages
10
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$10.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Studyclock
4.2
(234)
Sold
886
Followers
492
Items
8765
Last sold
1 week ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions