DVP SWPPP EXAM QUESTIONS
AND VERIFIED ANSWERS
The statute that established stormwater regulation in the 1970s is ANSWER.
The Clean Water Act
The following rule, ANSWER NPDES, specifies the requirements for
controlling stormwater activities on a building site.
Which of the following describes a stormwater discharge from a construction
site that is never permitted? ANSWER leakage from polluted groundwater
When all construction, both inside and outside the structure, is finished and
permanent stabilization has been confirmed to be sufficient to satisfy permit
requirements, the notice of termination may be filed.
Before construction begins, all of the following must take place with stormwater
permitting, except for ANSWER Send in the termination notice (NOT).
Submission of the stormwater notice of intent (NOI) is required. ANSWER
Before construction begins and following the completion of the SWPPP
A construction site may contain the following possible sources of pollutants:
ANSWER 1. Petroleum storage tanks
2. Sediments in soil
3. Masonry supplies
4. EVERYTHING ABOVE
It is possible to alter the SWPPP inflammatory sequence. ANSWER Following
formal clearance and consultation with the project owner and SWPPP Designer
(CEC), if necessary
With the exception of ANSWER Notices of Violation, an SWPPP site map will
display everything.
, Which of the following details should be displayed at the site's entrance?
ANSWER 1. Notice of construction site 2. Authorization for permits
3. SWPP's location
4. EVERYTHING ABOVE
Which of these uses of water is NOT advantageous? ANSWER Using a storm
drain to flush a spill
Make sure to ANSWER when installing and maintaining a check dam. In the
center of the channel is the check dam's low point, or overflow.
You should ANSWER in order to lessen the likelihood of undercutting in
channels. Place filter cloth beneath rocks and other items that are placed inside
the stormwater conveyance.
All except one of the following must be included in the SWPP's good
housekeeping section: ANSWER Stormwater management protocols after
construction
All except one of the following are runoff controls: ANSWER Products for
rolled erosion control
Which best management approach for erosion control slows down the overflow
of stormwater, dissipates rainfall energy, and improves water filtration?
ANSWER Vegetation
A contractor can only choose one of the following components that affect
erosion rates, but the one they have the most control over is groundcover.
For any disturbed sites that are anticipated to or will remain idle for 14 days or
longer, temporary stabilization should be put into place. ANSWER Immediately
A construction exit's main objective is ANSWER To minimize trackout and
remove silt from construction site vehicles
All of the following are examples of common forms of erosion, with the
exception of The sedimentation of the answer
AND VERIFIED ANSWERS
The statute that established stormwater regulation in the 1970s is ANSWER.
The Clean Water Act
The following rule, ANSWER NPDES, specifies the requirements for
controlling stormwater activities on a building site.
Which of the following describes a stormwater discharge from a construction
site that is never permitted? ANSWER leakage from polluted groundwater
When all construction, both inside and outside the structure, is finished and
permanent stabilization has been confirmed to be sufficient to satisfy permit
requirements, the notice of termination may be filed.
Before construction begins, all of the following must take place with stormwater
permitting, except for ANSWER Send in the termination notice (NOT).
Submission of the stormwater notice of intent (NOI) is required. ANSWER
Before construction begins and following the completion of the SWPPP
A construction site may contain the following possible sources of pollutants:
ANSWER 1. Petroleum storage tanks
2. Sediments in soil
3. Masonry supplies
4. EVERYTHING ABOVE
It is possible to alter the SWPPP inflammatory sequence. ANSWER Following
formal clearance and consultation with the project owner and SWPPP Designer
(CEC), if necessary
With the exception of ANSWER Notices of Violation, an SWPPP site map will
display everything.
, Which of the following details should be displayed at the site's entrance?
ANSWER 1. Notice of construction site 2. Authorization for permits
3. SWPP's location
4. EVERYTHING ABOVE
Which of these uses of water is NOT advantageous? ANSWER Using a storm
drain to flush a spill
Make sure to ANSWER when installing and maintaining a check dam. In the
center of the channel is the check dam's low point, or overflow.
You should ANSWER in order to lessen the likelihood of undercutting in
channels. Place filter cloth beneath rocks and other items that are placed inside
the stormwater conveyance.
All except one of the following must be included in the SWPP's good
housekeeping section: ANSWER Stormwater management protocols after
construction
All except one of the following are runoff controls: ANSWER Products for
rolled erosion control
Which best management approach for erosion control slows down the overflow
of stormwater, dissipates rainfall energy, and improves water filtration?
ANSWER Vegetation
A contractor can only choose one of the following components that affect
erosion rates, but the one they have the most control over is groundcover.
For any disturbed sites that are anticipated to or will remain idle for 14 days or
longer, temporary stabilization should be put into place. ANSWER Immediately
A construction exit's main objective is ANSWER To minimize trackout and
remove silt from construction site vehicles
All of the following are examples of common forms of erosion, with the
exception of The sedimentation of the answer