Correct Answers
A_____as applied to construction working drawings is an organized method of presenting a list
of materials. ✔️✔️schedule
______are a pivotal aspect of construction drawings as they often contain critical information
regarding the project. ✔️✔️Notes
How many cubic yard of concrete is required for constructing the 4" slab? ✔️✔️16 CY
How many cubic yard of concrete is required for constructing the 1' 6" footing? ✔️✔️14 CY
How many cubic yard of concrete is required for constructing the footing pad in the center of the
foundation? ✔️✔️1 CY
How many square feet of ceiling is required? ✔️✔️1030 SF
How many 2468 interior doors are there? ✔️✔️5
How many 2868 interior doors are there? ✔️✔️6
, How many 3068 exterior doors are there? ✔️✔️3
How many 3050 windows are there? ✔️✔️6
How many 6050 windows are there? ✔️✔️1
How many linear feet of 2x4 interior wall is required? ✔️✔️145 LF
How many square feet of 2x4 interior wall is there (both sides)? ✔️✔️2300 SF
How many linear feet of 2x6 interior wall is required? ✔️✔️18 LF
How many square feet of 2x6 interior wall is there (both sides)? ✔️✔️286 SF
How many linear feet of 2x4 exterior wall is required? ✔️✔️115 LF
How many square feet of 2x4 exterior wall is there (both sides)? ✔️✔️1835 SF
How many linear feet of 2x6 exterior wall is required ✔️✔️37 LF
How many square feet of 2x6 exterior wall is there (both sides)? ✔️✔️585 SF