Answers 100% Correct!!
What is a craftsman? - ANSWERMechanic or other individual trained in QA
methods/procedures to perform maintenance on ship's systems/components
(inspections, cleanliness, testing, documentation)
5 basic maintenance principles (PTTTM) - ANSWERProper-
-procedure
-training
-technical direction
-testing
-materials
5 responsibilities of a craftsman - ANSWER-Perform all maintenance in accordance
with approved procedure
-Ensure QA forms completed correctly
-sign, print, and date completed QA forms
-initiate a DFS (non-nuclear) or LAR (nuclear)
-ensure only TMDE with current calibration stickers/records attached/available, are
used for production, acceptance and testing
Who administers the QA program - ANSWERQuality Assurance Officer (QAO)
Who monitors QAO's administration of QA program - ANSWERExecutive Officer
(XO)
Vessel suffering a major steam leak in fire room, resulting in deaths of 10
watchstanders - ANSWERUSS Iwo Jima (LPH 2)
When did a major steam leak on the Iwo Jima killing 10 watchstanders occur -
ANSWEROctober 30, 1990
What caused the steam leak on the Iwo Jima - ANSWERBonnet fastners on SSTG
root valve replaced with black oxide coated brass vice carbon steel
Only authorize person in div to retrieve Controlled material from supply -
ANSWERControlled Material Petty Officer
What is the purpose of the QA program? - ANSWER-Ensure maintenance is
completed with first time quality
-give confidence to sailors that their equipment will operate reliably and safely
Vessel that sunk as a result of a piping failure in salt water system in engine room,
resulting in loss of vessel and all personnel onboard. - ANSWERUSS Thresher (SSN
593)
, When did the USS Thresher suffer from a flooding casualty in its engine room -
ANSWERApril 10, 1963
When did the space shuttle Challenger explode? - ANSWERJanuary 28, 1986
Space shuttle that exploded 73 sec into flight, losing 7 astronauts' lives -
ANSWERChallenger
Why did the Challenger explode? - ANSWERFailure of pressure seal in aft field joint
of right solid rocket motor
TWD - ANSWERtechnical work document
MP - ANSWERmaintenance procedure
TWD MPs are _______ in their existing form - ANSWERFully usuable
TWD MPs include- - ANSWER- MRCs
- MSs
- Ship Systems Manuals
- Component Technical Manuals
- Shipyard Process Instructions
- Ship Alteration Instructions
- RPMs
What is a FWP - ANSWERFormal Work Package
FWPs are created when? - ANSWERThe maintenance task does not have an
existing MP
FWPs should be as detailed- - ANSWERAs required
FWP will only be as detailed as required, to include- - ANSWER-complexity of work
-CRAFTSMAN KNOWLEDGE
-technical requirements
-extent of tests
-required supervision
The 5 MINIMUM sections of a FWP are - ANSWER-Material
-Initial Conditions
-Procedure
-Testing
-System Restoration
Margin symbol (V) - ANSWERVerification by a craftsman
Margin symbol (G) - ANSWERGovernment notification required
Meaning of OQE - ANSWERObjective Quality Evidence